Laserfiche WebLink
FEDERAL STATE C9T�° <br /> Type®f Work FEDERAL <br /> Cost % Cost % Cost m/® <br /> All construction <br /> costs excluding $5,720,000 80 $1,430,000 20 $ 0 NA $7,150,000 <br /> the following: <br /> Traffic Signals <br /> at Lost Bridge $108,000 90 $8,400 7 $3,600 3 $120,000 <br /> Road <br /> Traffic Signals <br /> at Southgate $108,000 90 $ 0 0 $12,000 10 $120,000 <br /> Drive <br /> Traffic Signals $108,000 90 $ 0 0 $12,000 10 $120,000 <br /> at Aldi Drive <br /> Traffic Signals <br /> at Maryland $108,000 90 $ 0 0 $12,000 10 $120,000 <br /> Street <br /> Traffic Signals $180,000 90 $20,000 10 $ 0 0 $200,000 <br /> at U.S. 36 <br /> Turn Lanes and <br /> Side Street <br /> Approaches at <br /> Southgate $44,000 80 $ 0 0 $11,000 20 $55,000 <br /> Drive, Aldi <br /> Drive, Properity <br /> Plaza and <br /> Maryland Street <br /> Airport Road <br /> Approach $72,000 80 $ 0 0 $18,000 20 $90,000 <br /> Resurfacing <br /> Airport Road <br /> Median <br /> Widening $ 0 0 $ 0 0 $25,000 100 $25,000 <br /> (Railroad <br /> Crossing <br /> Improvements)* <br /> Subtotal $6,448,000 $1,458,400 $93,600 $8,000,000 <br /> P&C <br /> Engineering $967,200 $218,800 $14,000 $1,200,000 <br /> 15% <br /> Total $7,415,200 $1,677,200 $107,600 $9,200,000 <br /> *Reimbursable through Grade Crossing Protection Funding (GCPF) <br /> Participation and reimbursement shall be predicated by the percentages shown above for the <br /> specified work. Cost shall be determined by multiplying the final quantities by the contract <br /> unit prices plus 15% for construction and preliminary engineering. Participation toward traffic <br /> signals shown above shall not exceed $57,000 which represents 125% of their estimated <br /> construction and engineering cost. <br />