My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-44 Resolution Accepting the Bid and Authorizing the Execution of a Contract with E.L. Pruitt Co. for the Replacement of HVAC and Controls System for Transit Services
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-44 Resolution Accepting the Bid and Authorizing the Execution of a Contract with E.L. Pruitt Co. for the Replacement of HVAC and Controls System for Transit Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 2:25:51 PM
Creation date
3/9/2023 4:45:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-44
Res Ord Title
R2023-44 Resolution Accepting the Bid and Authorizing the Execution of a Contract with E.L. Pruitt Co. for the Replacement of HVAC and Controls System for Transit Services
Department
Mass Transit
Approved Date
6/3/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> A-pr��- <br /> THIS CONTRACT,made and entered into this _ay af`Mtriaeh,2023,by and between the City <br /> of Decatur,Illinois,an Illinois municipal corporation,hereinafter called"Owner",and E.L.Pruitt <br /> Co.,hereinafter called the"Contractor". <br /> WITNESSETH: <br /> That for and in consideration of the payments,covenants,and agreements stated herein, <br /> the Contractor and Owner agree as follows: <br /> 1. The Contractor shall perform and complete in a good and workmanlike manner all <br /> work required in connection with all documents, terms and conditions set forth in <br /> the bid documents entitled "Transit HVAC Replacement IFB# Transit 2022- <br /> 06", as well as the base bid and Alternate#4 submitted by Contractor(hereinafter <br /> referred to as"Contract Documents") including any and all Addenda prepared by <br /> the Engineer,with specifications and drawings set forth in the Contract Documents <br /> made a specific part of this Contract; and in strict compliance with the Contract <br /> Documents; and the Contractor shall do everything required by this Contract <br /> According to the contractor's price schedule, base bid price is $174,495.00 and <br /> Alternate #4 price is $53,455.00. Therefore, the contract shall not exceed <br /> $227,950.00. Any additional work will not be paid without a prior written price <br /> approval and approved work change order. <br /> 2. Payments are to be made to the Contractor by the Owner in accordance with and <br /> subject to the provisions embodied in the documents made a part of this Contract, <br /> or as prescribed by law. <br /> 3. Work under this Contract shall commence on the date specified in the written <br /> Notice to Proceed from the Owner to the Contractor. Upon receipt of said Notice, <br /> the Contractor shall diligently and continuously prosecute and substantially <br /> complete all Work under this Contract. <br /> 4. A Completion Date for this project is May 1,2023.A change order will need to be <br /> executed should the project exceed completion date. <br /> 5. This Contract consists of the following component parts, herein defined as the <br /> Contract Documents, all of which are as full a part of this Contract as if herein set <br /> out verbatim,or if not attached,as if hereto attached: <br /> Advertisement for Bids General Conditions <br /> Information for Bidders Special Conditions <br /> Bid Proposal Standard Specifications <br /> Non-Collusion Affidavit Project Drawings <br /> Contract(This Instrument) Special Provisions <br /> Contract Change Orders Supplemental Specifications <br /> Performance Bond Appendix(s) <br /> Addenda#s 1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.