Laserfiche WebLink
Architect's review shall not constitute approval of safety precautions or any construction means,methods, <br /> techniques,sequences or procedures. <br /> §3.4.4.2 If the Contract Documents specifically require the Contractor to provide professional design services or <br /> certifications by a design professional related to systems,materials or equipment,the Architect shall specify the <br /> appropriate performance and design criteria that such services must satisfy.The Architect shall review and take <br /> appropriate action on Shop Drawings and other submittals related to the Work designed or certified by the <br /> Contractor's design professional,provided the submittals bear such professional's seal and signature when <br /> submitted to the Architect.The review shall be for the limited purpose of checking for conformance with <br /> information given and the design concept expressed in the Contract Documents.The Architect shall be entitled to <br /> rely upon,and shall not be responsible for,the adequacy and accuracy of the services,certifications,and approvals <br /> performed or provided by such design professionals. <br /> §3.4.4.3 The Architect shall review and respond to written requests for information about the Contract Documents. <br /> The Architect's response to such requests shall be made in writing within any time limits agreed upon,or otherwise <br /> with reasonable promptness. <br /> §3.4.5 Changes in the Work <br /> The Architect may order minor changes in the Work that are consistent with the intent of the Contract Documents <br /> and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. Subject to Section <br /> 4.2.3,the Architect shall prepare Change Orders and Construction Change Directives for the Owner's approval and <br /> execution in accordance with the Contract Documents. <br /> §3.4.6 Project Completion <br /> The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date of <br /> final completion;issue Certificates of Substantial Completion;forward to the Owner,for the Owner's review and <br /> records,written warranties and related documents required by the Contract Documents and received from the <br /> Contractor;and issue a final Certificate for Payment based upon a final inspection indicating that,to the best of the <br /> Architect's knowledge,information,and belief,the Work complies with the requirements of the Contract <br /> Documents. <br /> ARTICLE 4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> §4.1 Supplemental Services are not included in Basic Services but may be required for the Project.The Architect <br /> shall provide the Supplemental Services indicated below,and the Owner shall compensate the Architect as provided <br /> in Section 11.2. Supplemental Services may include programming,site evaluation and planning,environmental <br /> studies,civil engineering,landscape design,telecommunications/data,security,measured drawings of existing <br /> conditions,coordination of separate contractors or independent consultants,detailed cost estimates,on-site project <br /> representation beyond requirements of Section 4.2.2,value analysis,interior architectural design,tenant related <br /> services,preparation of record drawings,commissioning,sustainable project services,and any other services not <br /> otherwise included in this Agreement. <br /> (Idents below the Supplemental Services that the Architect is required to provide and insert a description of each <br /> Supplemental Service, if not further described in an exhibit attached to this document.) <br /> Services under Article 4 shall be provided under the same terms as Basic Services. <br /> §4.2 The Architect may provide Additional Services after execution of this Agreement without invalidating the <br /> Agreement.Upon recognizing the need to perform Additional Services,the Architect shall notify the Owner.The <br /> Architect shall not provide the Additional Services until the Architect receives the Owner's written authorization. <br /> Except for services required due to the fault of the Architect,any Additional Services provided in accordance with <br /> this Section 4.2 shall entitle the Architect to compensation pursuant to Section 11.3. <br /> §4.2.1 The Architect shall provide services necessitated by a change in the Initial Information,changes in previous <br /> instructions or approvals given by the Owner,or a material change in the Project including size;quality;complexity; <br /> the Owner's schedule or budget for Cost of the Work;or procurement or delivery method as an Additional Service. <br /> §4.2.2 The Ar-ehiteet has ineluded in Basie Sen4ees ( )visits to the site by the Ar-ehiteet during eenstmetion.The <br /> . <br /> Init. AIA Document B104—2017.Copyright @ 1974,1978,1987,1997,2007 and 2017.All rights reserved.'The American Institute of Architects,""American Institute <br /> of Architects,'"AIA,"the AIA Logo,and"AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 6 <br /> t 21:26:32 CT on 03/29/2023 under Order No.4104236690 which expires on 09/30/2023,is not for resale,is licensed for one-time use only,and may only be used <br /> in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. <br /> User Notes: (369ADA31F) <br />