§4.2.2 The 4-r-ol;4peat has ineluded i;;Rasie get-�,iees visits to thesitta by the Architect during Genstpaction The
<br /> Afehiieet shall eefidiiet site visits in exeess of th4 ametmt as an Additional Sef:viee.
<br /> 4.2.3 The Afehiteet shall,as an Additional Sefviee,pr-evide sen,iees made neeessar-y by a Gontmetor-'s pr-opo.
<br /> ehange in the Work.The Architeet shall ______s to the A reh4pot"';14;,#R4R;RM#;ofS op,i pp.;;PP,
<br /> itated by
<br /> (`1...nge Or-de... And—C-ensiti-detio..rpt,..nge Dir-.,ewes,. n Additional nal Seryiee
<br /> §4.2.4
<br /> Agr-eement,through no fault of the Ar-ehiteet,extension of the Ar-ehiteet's sen,iees beyead thm tifne shall he
<br /> eampensated as Additional St-pietas
<br /> ARTICLE 5 OWNER'S RESPONSIBILITIES
<br /> §5.1 Unless otherwise provided for under this Agreement,the Owner shall provide information in a timely manner
<br /> regarding requirements for and limitations on the Project,including a written program which shall set forth the
<br /> Owner's objectives,schedule,constraints and criteria,including space requirements and relationships,flexibility,
<br /> expandability,special equipment,systems and site requirements.
<br /> §5.2 The Owner shall establish the Owner's budget for the Project,including(1)the budget for the Cost of the Work
<br /> as defined in Section 6.1;(2)the Owner's other costs;and,(3)reasonable contingencies related to all of these costs.
<br /> The Owner shall update the Owner's budget for the Project as necessary throughout the duration of the Project until
<br /> final completion.If the Owner significantly increases or decreases the Owner's budget for the Cost of the Work,the
<br /> Owner shall notify the Architect.The Owner and the Architect shall thereafter agree to a corresponding change in
<br /> the Project's scope and quality.
<br /> §5.3 The Owner shall furnish surveys to describe physical characteristics,legal limitations and utility locations for
<br /> the site of the Project;a written legal description of the site;and services of geotechnical engineers or other
<br /> consultants,when the Architect requests such services and demonstrates that they are reasonably required by the
<br /> scope of the Project.
<br /> §5.4 The Owner shall coordinate the services of its own consultants with those services provided by the Architect.
<br /> Upon the Architect's request,the Owner shall furnish copies of the scope of services in the contracts between the
<br /> Owner and the Owner's consultants.The Owner shall require that its consultants and contractors maintain insurance,
<br /> including professional liability insurance,as appropriate to the services or work provided.
<br /> §5.5 The Owner shall furnish tests,inspections and reports required by law or the Contract Documents,such as
<br /> structural,mechanical,and chemical tests;tests for air and water pollution;and tests for hazardous materials.
<br /> §5.6 The Owner shall furnish all legal,insurance and accounting services,including auditing services,that may be
<br /> reasonably necessary at any time for the Project to meet the Owner's needs and interests.
<br /> §5.7 The Owner shall provide prompt written notice to the Architect if the Owner becomes aware of any fault or
<br /> defect in the Project,including errors,omissions or inconsistencies in the Architect's Instruments of Service.
<br /> §5.8 The Owner shall endeavor to communicate with the Contractor through the Architect about matters arising out
<br /> of or relating to the Contract Documents.
<br /> §5.9 The Owner shall provide the Architect access to the Project site prior to commencement of the Work and shall
<br /> obligate the Contractor to provide the Architect access to the Work wherever it is in preparation or progress.
<br /> §5.10 Within 15 days after receipt of a written request from the Architect,the Owner shall furnish the requested
<br /> information as necessary and relevant for the Architect to evaluate,give notice of,or enforce lien rights.
<br /> ARTICLE 6 COST OF THE WORK
<br /> §6.1 For purposes of this Agreement,the Cost of the Work shall be the total cost to the Owner to construct all
<br /> elements of the Project designed or specified by the Architect and shall include contractors' general conditions costs,
<br /> overhead and profit.The Cost of the Work also includes the reasonable value of labor,materials,and equipment,
<br /> Init. AIA Document 8104—2017.Copyright @ 1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute
<br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 7
<br /> 21:24:43 CT on 03/29/2023 under Order No.4104236690 which expires on 09/30/2023,is not for resale,is licensed for one-time use only,and may only be used
<br /> in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com.
<br /> User Notes: (369ADAY)
<br />
|