Laserfiche WebLink
RCPP Project ID:2724 <br /> • Initial site visits and assessment <br /> Steps 3 and 4—inventory resources and analyze resource data; <br /> • Additional site visits <br /> • Documenting resource concerns <br /> • Preparing maps <br /> • Database research <br /> • Perform assessments using the appropriate business tools <br /> Step 5 and 6—formulate and evaluate alternatives; <br /> • Prepare preliminary designs <br /> • Prepare proposed conservation plan <br /> • Conduct additional applicant interviews <br /> • Conduct additional site visits <br /> Step 7-make decisions; <br /> • Document applicant decisions <br /> • Assess any Land Management activity applications <br /> • Digitize plan <br /> • Final conservation plan <br /> • Final maps <br /> • Select Land Management activity applications <br /> • Complete any Land Management contracting activities <br /> Step 8 —implement the plan; <br /> • Planning <br /> • Uses must be directly related to installation or management of Land Management activities <br /> • Design <br /> • Site survey <br /> • Geologic investigations, test pits, and other geotechnical tests and software runs <br /> • Detailed analysis and Final Design <br /> • Job-sheets <br /> • Cost estimates <br /> • Engineering review <br /> • Installation <br /> • Site layout <br /> • Pre-construction meetings <br /> • On-site oversight <br /> • Evaluating changes/updating designs/processing modifications <br /> • Checkout <br /> • Documentation of installed/completed activities meeting NRCS standards <br /> • Processing payments <br /> • Finalize/Provide Operation and Maintenance Requirements <br /> • Support appropriate 900 series practice payments (in producer contracts) <br /> Step 9—evaluate the plan; <br /> • Follow-up visits for operation and maintenance <br /> • Evaluation, monitoring, and reporting <br /> Page 32 of 51 <br />