Laserfiche WebLink
t , <br /> RCPP Project ID:2724 <br /> Step 8—implement the plan; <br /> • Planning <br /> §Uses must be directly related to installation or management of Rental activities <br /> • Design <br /> • Site survey <br /> • Installation <br /> • Site layout <br /> • Pre-construction meetings <br /> • On-site oversight <br /> • Evaluating changes/updating designs/processing modifications <br /> • Checkout <br /> • Documentation of installed/completed activities meeting NRCS standards <br /> • Processing payments <br /> • Finalize/Provide Operation and Maintenance Requirements <br /> • Support appropriate 900 series practice payments (in producer contracts) <br /> • Geologic investigations, test pits, and other geotechnical tests and software runs <br /> • Detailed analysis and Final Design <br /> • Job-sheets <br /> • Cost estimates <br /> • Engineering review <br /> Step 9—evaluate the plan; <br /> • Follow-up visits for operation and maintenance <br /> • Evaluation, monitoring, and reporting <br /> Any post-project covered program land management contract support <br /> Many of the activities listed above may be exceed the duration of the project agreement, at which point <br /> NRCS must reserve adequate TA to continue management of the activities after agreement expiration <br /> Table 213-2: Cross reference Table 213-1 (above) and RCPP TA-I practice types (as included in Project <br /> Partner TA-I Deliverables) and use Table 213-2 to document proposed TA-I activities, and the rationale for <br /> their inclusion in the project. <br /> Table 213-2: RCPP Rentals, Partner Use TA-Implementation (TA-I) <br /> Description and rationale should cover each FA Rental Activity related <br /> RCPP TA practice type for which Partner TA-I funds are budgeted. <br /> Rationale may include, but are not limited to 1)known limitations on <br /> NRCS staffing or expertise to accomplish critical tasks in the project area <br /> Page 45 of 51 <br />