Laserfiche WebLink
Exhibit A <br /> Scope of Services <br /> Consulting Engineer will provide the following Services to City: <br /> 1. Conduct a face-to-face kickoff meeting for the project and collect additional information, including <br /> the following: <br /> a. Distribution system improvements installed by City since the 2018 modeling. <br /> b. Updated water system demand data for the last three years. <br /> C. Current and proposed City zoning map for the area of development to be considered as part <br /> of the evaluation. <br /> d. Planning reports by others indicating future population and demand projections for City's <br /> water system. <br /> e. Proposed distribution system improvements included in City's capital improvement program. <br /> f. South Water Treatment Plant capacity-related information and design criteria. <br /> g. Other information necessary for water system modeling. <br /> 2. Review data requested from City and develop probable water system basic supply capacity and <br /> demands for serving the proposed development areas for use in water system modeling for approval <br /> by City. <br /> 3. Update City's water system model with current and future planned improvements using the <br /> additional water system demands for the proposed development. <br /> 4. Develop current and future model scenarios, with input from City, based on increased demands <br /> resulting from new City developments in the Northeast Zone. <br /> 5. Perform steady state and extended period simulations(EPS), using the updated model calibrated as <br /> of 2018,to predict the performance of the distribution system based on: <br /> a. Simulated growth in the Northeast Zone without additional water system modifications. <br /> b. Simulated growth in Northeast Zone with previously evaluated modifications. <br /> C. Simulated growth in the Northeast Zone as a separate pressure zone and with previously <br /> evaluated modifications. <br /> d. One additional scenario if the need for additional system modifications to meet projected <br /> demand in the Northeast Zone development area is greater than those previously evaluated. <br /> 6. Prepare a draft technical memorandum describing the steady state and EPS conditions modeled in <br /> the four scenarios above for review and discussion with City via videoconference. <br /> 7. Perform additional modeling for the two scenarios selected by City based on technical <br /> memorandum review comments and input. <br /> A-1 <br />