Laserfiche WebLink
SA 2271 <br /> (a) Vacation of the roadway on both sides of the William Street grade <br /> crossing, by the City. <br /> (b) Installation of temporary Type-III barricades conforming to the <br /> requirements of 92 III. Adm. Code 1535.701 and the Manual on Uniform <br /> Traffic Control Devices, on both sides of the vacated William Street <br /> crossing, within 24-hours after receipt of a Commission Order approving <br /> the closure, by the City. <br /> (c) Removal and proper disposal of all existing William Street grade crossing <br /> surface material, asphalt approach pavement, and railroad warning <br /> devices within the Company's Right-of-Way (ROW), in coordination with <br /> the City, and within 90 days after receipt of a Commission Order approving <br /> the closure, by the Company. <br /> (d) Removal of concrete approach pavement on both sides of the crossing <br /> with topsoil replacement and re-seeding, as well as curb and sidewalk <br /> extensions, per Exhibit B, Pages 1 and 2), in coordination with the <br /> Company, and within 90 days after receipt of a Commission Order <br /> approving the closure, by the City. <br /> (e) Refund the City, as detailed herein, from the Grade Crossing Protection <br /> Fund for completion of the work contemplated and estimated in the <br /> attached Exhibit B, by IDOT. <br /> (f) Issue the City a Federal Section 130 Closure Incentive Payment, as <br /> detailed herein, for completion of the voluntary closure-vacation, by <br /> IDOT. <br /> (g) Issue the City a Railroad Closure Incentive Payment, as detailed herein, <br /> for completion of the voluntary closure-vacation, by the Company. <br /> Section 3 The City shall enact a local Ordinance/Resolution vacating William Street on <br /> both sides of the crossing, but the final vacation and physical closure of the roadway shall <br /> authorizing an incentive <br /> d autho payment <br /> not take place until a Commission Order has been issue g <br /> from the Grade Crossing Protection Fund for the closure-vacation. <br /> The City has provided a preliminary construction cost estimate (Exhibit B, Page 3) to <br /> accomplish its proposed work, which may be required by Commission Order. The City shall, <br /> submit the plans, estimates of cost and any required specifications for the proposed <br /> improvements to the Department's District 7 office for approval. <br /> The Department shall provide approval or disapproval of the final construction drawings, <br /> estimates of cost and any required specifications for the proposed improvements. <br /> Section 4 The City shall begin the William Street physical closure sequence and <br /> necessary coordination with the Company within 24 hours after receipt of a Commission <br /> 2 <br />