My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-91 Resolution Accepting the Quote and Authorizing the Work with Christy-Foltz, Inc for Interior Painting at Transit Center 353 E. William
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-91 Resolution Accepting the Quote and Authorizing the Work with Christy-Foltz, Inc for Interior Painting at Transit Center 353 E. William
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 9:28:11 AM
Creation date
5/11/2023 9:28:10 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-91
Res Ord Title
R2023-91 Resolution Accepting the Quote and Authorizing the Work with Christy-Foltz, Inc for Interior Painting at Transit Center 353 E. William
Department
Mass Transit
Approved Date
5/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C H R I S T Y F O LT Z I N C B U I L D E R S <br /> 740 SOUTH MAIN STREET . DECATUR . ILLINOIS . 62525 <br /> P. O . BOX 828 AREA CODE 217 .428- 8601 <br /> April 13, 2023 <br /> City of Decatur <br /> Attn: Mike Pritchett <br /> Re:Transit Center Painting <br /> Mike: <br /> We propose to supply all the labor, material, equipment, and insurance to complete the proposed <br /> painting for the sum of$21,273.00. This price includes the following scope of work: <br /> • Replace/ repair damaged drywall in office where casework removed <br /> • Finish replaced drywall <br /> • Spot prep all other walls to repair minor blemishes <br /> • Apply two coats of paint to all walls within the center <br /> • Apply two coats of paint to door frames within the center <br /> • Apply 2 coats of paint to hollow metal window frames within the center <br /> • Includes provisions to protect furniture, casework,and floors <br /> • Includes provisions to perform work while center remains open to public <br /> • Painting of soffit assembly and maintenance office are provided as additive alternates below <br /> • ADD$4,068.00 to prep and apply 2 coats of paint to the soffit <br /> • ADD$1,180.00 to prep and apply 2 coats of paint to maintenance office walls <br /> • Exclusions on page 2... <br /> �MIN1t <br />
The URL can be used to link to this page
Your browser does not support the video tag.