R2023-99 Resolution Authorizing Supplement #2 to the Professional Engineering Services Agreement with AECOM for Design Services for the Brush College Road Grade Separation over Faries Parkway and the Norfolk Southern Railroad
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-99 Resolution Authorizing Supplement #2 to the Professional Engineering Services Agreement with AECOM for Design Services for the Brush College Road Grade Separation over Faries Parkway and the Norfolk Southern Railroad
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 10:54:03 AM
Creation date
5/17/2023 10:50:07 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-99
Res Ord Title
R2023-99 Resolution Authorizing Supplement #2 to the Professional Engineering Services Agreement with AECOM for Design Services for the Brush College Road Grade Separation over Faries Parkway and the Norfolk Southern Railroad
Department
Public Works
Approved Date
5/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A- Supplement 2 <br /> o Updates to plans accommodate changes for the following items: <br /> ■ Update existing utility information from field locates,AT&T potholing data, and <br /> Ameren high pressure gas line potholing <br /> ■ Update existing utility information to reflect recent construction by ADM (relocated <br /> fiber optic line)and Ameren(gas transmission line relocation near James/Logan)on <br /> plans and cross sections <br /> ■ Review and updates to water main,storm sewer and sanitary sewer design location <br /> resulting from HP gas line locate along Brush College near Harrison and along <br /> Faries Parkway <br /> ■ Design revisions to accommodate proposed pole locations prepared by Ameren <br /> ■ Address comments provided by railroads after 100% PS&E prepared for January <br /> 2021 submittal <br /> ■ ADM Renovation Site parking lot redesign <br /> ■ Addition of temporary fence around select remaining properties for security <br /> purposes during construction after existing fences have been removed <br /> ■ ADM Spiral Plant sidewalk design revision to address ADM needs and fit within the <br /> PR ROW limits <br /> ■ Responding to SDD comments on the integrity of their existing sewer crossing <br /> Faries Parkway, adjustments were made to the grading on top of and around the <br /> culvert extension and an additional easement was added to accommodate the <br /> regrading of the slope and ditch <br /> ■ Plan updates to address IDOT comments from 90%plans,submitted in November <br /> 2020, which were provided after 100%were completed and required additional <br /> rework as they were not provided prior to the development of the January 2021 <br /> PS&E set. <br /> ■ Adjustment to radius return,ADA ramp,drainage, and grading at Brush College <br /> Road and W Harrison(east leg)to avoid need for PR ROW,which could not be <br /> obtained via condemnation or quick take <br /> ■ Updates to the design of the railroad signal locations on Faries and associated <br /> sidewalks and ADA ramp locations as well as drainage design per ICRR comments <br /> received after 100%PS&E was prepared <br /> ■ Inclusion of information on the Temporary Soil Retention Systems(TSRS) for the <br /> installation of proposed utilities beneath and adjacent to the existing railroad tracks, <br /> when the system will be designed by the contractor to receive the final permit from <br /> the railroads <br /> ■ Temporary and final grading revisions to reflect the above-listed changes <br /> o Updates to design files to account for design and grading revisions,which required updates <br /> to cross sections <br /> Specifications:The AECOM Team will update the line item specifications for the July 2021 letting <br /> using IDOT format for any IDOT pay items that have changed,which include: <br /> o Spec updates per ICRR comments and requirements in the railroad agreement provided in <br /> early 2021 <br /> o Spec revisions to reflect changes from coordination with IDOT on BLRs pay items for items <br /> specific to this contract. <br /> - Quantity Take-Offs and Opinions of Cost: The AECOM Team will update quantity take-offs to <br /> reflect changes to IDOT pay items method of measurement, plans as well as to reflect design <br /> changes as noted in this scope including updated quantities for the earthwork. The AECOM Team <br /> will prepare an updated project opinion of cost for the Final submittal for the July 2021 letting. The <br /> 4 Supplement 2 05/09/2023 <br />