Laserfiche WebLink
Exhibit A— Scope of Services <br /> Detailed Phase III Engineering Scope of Services <br /> Brush College Road at Norfolk Southern Railroad and Faries Parkway <br /> AECOM Technical Services, Inc. <br /> For Decatur Illinois <br /> April 26,2023 <br /> General <br /> This document serves as the scope of services for Phase III Construction Engineering Services for an <br /> overpass carrying Brush College Road over the Norfolk Southern Railroad and Faries Parkway in Decatur, <br /> Illinois. This is the basis for an agreement with the City of Decatur, Illinois. The scope of work has been <br /> broken down into the following tasks: <br /> Task 01000 Field Work <br /> Task 02000 Office Support <br /> Task 03000 Project Management <br /> Task 04000 ODC <br /> Task 05000 Quigg Engineering, Inc <br /> Task 06000 WHKS & Co. <br /> Project Understandine <br /> It is our understanding that Phase III Construction Services are required for the construction of Brush <br /> College Roadway over Faries Parkway and Norfolk Southern Railroad Section 09-00933-01-BR Contract <br /> Number 95893. City Project Number 2009-33. The project includes a two-span bridge, multiple retaining <br /> walls and approach roadways including off system roadways. The project includes watermain relocation and <br /> storm sewer installation requiring jack and bore operations under two railroads,the Norfolk Southern and <br /> Illinois Central (CN) Railroads. <br /> The project will be stage constructed to maintain traffic and requires the use of detour routes. Faries <br /> Parkway will maintain traffic flow while sections of Brush College Road will be closed at times utilizing the <br /> detour routes. The closure of the south leg of Brush College Road at the existing railroad underpass should <br /> be minimized when possible. <br /> The project timeline for manpower planning is from September 1, 2023 —September 30 ,2026. It is <br /> anticipated that the PS&E will be on a August 4,2023 letting. It is assumed for this estimate that the <br /> Contractor will have substantial completion by August 14,2026. <br /> Roadway Reconstruction Limits <br /> The project limits on Brush College extend from station 46+59.44 just north of the existing NS RR viaduct to <br /> station 78+00 just north of Harrison Street. The work will include improvements to Faries Parkway station <br /> 205+00 to 235+50,and a connector roadway between Faries Parkway and the new Brush College Road <br /> overpass. Access roadway improvements will include James Street,Logan Street, a new Access Roadway <br /> for Harrison Ave(west leg),Harrison Ave(east leg), a Cul-De-Sac on Olive Street, and Access Roadway <br /> from Harrison Ave to the Lutheran Cemetery. <br /> Task 01000 Field Work <br /> The AECOM team has the skills, knowledge,and ability to effectively manage this project and to coordinate <br /> Phase III Services for the City of Decatur(City). The AECOM team will provide services for this contract as <br /> established in this scope of services,per the schedule established for Phase III. It is anticipated that the <br /> Contractor will work five days per week with reasonable overtime and occasional Saturdays. For this <br /> estimate the RE,Assistant RE and Construction Observer as well as the Document Engineer will work <br /> overtime hours with occasional Saturdays during the construction season from March through November. <br /> Phase III Scope 04-26-23 Ex A PH III <br />