My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-114 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades Design City Project 2023-12
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-114 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades Design City Project 2023-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 8:48:06 AM
Creation date
6/7/2023 8:48:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-114
Res Ord Title
R2023-114 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades Design City Project 2023-12
Department
Public Works
Approved Date
6/5/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> OOL <br /> /991001 <br /> CONCENTRIC <br /> INTEGRATION <br /> a) SCC3/FCC 1/FCC2/FCC3/FCC4/FCC5/FCC6—Filter Gallery <br /> b) BPS—Booster Pump Station (next to raw booster station) <br /> c) SCC12—Williams Street PS <br /> d) SCC13—Sludge Lagoon <br /> e) SCC14—Fairview Level Station <br /> f) SCC15—Friends Creek Level Station <br /> g) SCC16—Long Creek Level Station <br /> h) SCC17—Monticello Level Station <br /> i) SCC18—Division Street Tank Valve Vault <br /> j) SCC19—Garfield Tank Valve Vault <br /> k) SCC20—Brush College Tap <br /> 1) SCC21—Franklin St.Tank <br /> m) SCC22—ADM monitoring <br /> n) Master Radio Control Panel <br /> 2) Perform a diagnostic review of the following radios to determine signal quality between radio sites. <br /> a) Water treatment plant master radio. <br /> b) Garfield elevated tank repeater radio. <br /> 3) Evaluate current communications method between remote stations and the main plant to determine the <br /> best method of improving communication uptime. <br /> 4) Conduct one (1) meeting in person or remotely via Microsoft Teams with the City to discuss the findings <br /> and proposed upgrade recommendations determined during steps one (1)and two (2). <br /> Control Panel Design <br /> 1. Provide replacement control panel designs for the following panels based on the final determinations <br /> made during the preliminary design. The control panel designs will consist of a bill of material, control <br /> panel wiring schematics, control panel component layout, and terminal block layout. <br /> a. SCC3/FCC1/FCC2/FCC3/FCC4/FCC5/FCC6—Filter Gallery <br /> b. BPS—Booster Pump Station (next to raw booster station) <br /> c. SCC12—Williams Street PS <br /> d. SCC13—Sludge Lagoon <br /> e. SCC14—Fairview Level Station <br /> f. SCC15—Friends Creek Level Station <br /> g. SCC16—Long Creek Level Station <br /> h. SCC17—Monticello Level Station <br /> i. SCC18—Division Street Tank Valve Vault <br /> j. SCC19—Garfield Tank Valve Vault <br /> Project#230176.50 Page No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.