My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-159 Resolution Accepting the Proposal and Authorizing the Execution of an Agreement for Professional Services for the Electric Vehicle Readiness Plan with CDM Smith
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-159 Resolution Accepting the Proposal and Authorizing the Execution of an Agreement for Professional Services for the Electric Vehicle Readiness Plan with CDM Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:44:30 AM
Creation date
8/10/2023 9:44:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-159
Res Ord Title
R2023-159 Resolution Accepting the Proposal and Authorizing the Execution of an Agreement for Professional Services for the Electric Vehicle Readiness Plan with CDM Smith
Department
Mass Transit
Approved Date
8/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 EV Trends and Forecasts <br /> 3.1 EV Adoption Estimates.Under this subtask,CDM Smith will develop a planning-level <br /> forecast of EV adoption in Macon County.CDM Smith will develop a planning-level,data- <br /> driven forecast of EV adoption rates using data sources such as the US Energy Information <br /> Administration and Bloomberg New Energy Finance.Other factors including state and <br /> federal EV incentives,recent EV adoption rates,and automaker commitments may also be <br /> reflected. <br /> 3.2 EV Forecast.The findings of the analysis completed in Task 3.1 will be summarized in a <br /> PowerPoint presentation not to exceed 10 slides.The presentation will be subject to one <br /> round of client review and revision. <br /> DeliverablesDirect <br /> ' EV forecast PowerPoint presentation(up to <br /> 10 slides) <br /> 4 Needs Assessment and Gap Analysis <br /> 4.1 Identification of Needs and Gaps.Leveraging technical outputs from Task 3 (existing <br /> conditions)and Task 4 (EV forecast and emerging tech),CDM Smith will develop an <br /> evaluation of EV charging infrastructure needs and gaps in the City and region. <br /> Considerations for this evaluation will include an analysis of geographic distribution,utility <br /> capacity,EV adoption and fleet penetration,equity,and workforce development needs.The <br /> evaluation will leverage City data and publicly available tools designed to assist in planning <br /> for EV charging infrastructure,including those made available from the U.S.Department of <br /> Transportation and Joint Office of Energy and Transportation (JOET). <br /> 4.2 EV Charging Opportunities.Leveraging EV fleet adoption forecasts,current charging <br /> station types and locations,utility data,and data and information provided by the City,CDM <br /> Smith will provide a planning-level review of the requirements that may be placed on the <br /> local electrical grid.CDM Smith will also provide planning-level guidance on the site-level <br /> engineering requirements to support either Level 2 or DCFC charging,including electrical <br /> equipment requirements,site design standards,and best practices for equitable access (e.g., <br /> ADA compliance and pricing and ownership considerations for the charging stations).The <br /> siting analysis will not include environmental or infrastructure conditions for individual <br /> sites.Leveraging the map of existing facilities developed in Task 3,CDM Smith will conduct <br /> GIS analysis to identify gaps in the current charging network and make recommendations to <br /> fill those gaps in an EV charging opportunities map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.