My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-197 Resolution Authorizing the Proposal from E.L. Pruitt Co. for Replacement of Galvanized Piping at the Decatur Public Library
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-197 Resolution Authorizing the Proposal from E.L. Pruitt Co. for Replacement of Galvanized Piping at the Decatur Public Library
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 12:25:53 PM
Creation date
9/20/2023 12:25:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-197
Res Ord Title
R2023-197 Resolution Authorizing the Proposal from E.L. Pruitt Co. for Replacement of Galvanized Piping at the Decatur Public Library
Department
City Manager
Approved Date
9/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.L.Pruitt Co. <br /> 121 South Webster Street <br /> ois <br /> 23 <br /> E.L. Pruitt Co. Phone:2l7.42.950 <br /> Phone:217.422.9590 <br /> Fax:217.42.9565 <br /> Mechanical Contractors vvr,:eloruitt.com <br /> L Lic.#058-147422 <br /> L Lic.#FSC 0028 <br /> September 7,2023 <br /> City of Decatur, IL <br /> 1 Gary K.Anderson Plaza <br /> Decatur, Illinois 62523 <br /> Re: Decatur Library—Emergency Replacement of Galvanized Piping <br /> We propose to furnish the necessary supervision,labor, materials,and equipment to complete the above <br /> referenced project as described below: <br /> 1.) Replace existing domestic hot water piping in 151 floor ceiling. <br /> • DEMO/removal of approx.250'of galvanized domestic hot water piping(21/z"& 1 '/2") <br /> • Furnish I install approx.250'of new copper type L domestic hot water piping(2"&1 '/z") <br /> • Furnish/install all new hangers,valves,fittings,etc....necessary to complete the system. <br /> • Tie-in of existing"branch lines"with new isolation valves is included. <br /> • Removal/replacement of all necessary ceiling tiles to perform work is included. <br /> • Scissor lift rental to access high ceilings is included. <br /> • Shutdown/isolation/start-up&filling system is included. <br /> 2.) This proposal contingent on existing isolation valves in good working conditions. <br /> Above work for the budgetary T&M NTE price of:$26,000.00 <br /> Items of clarification: <br /> 1. Budget does not include protection(covering,moving,etc.)of carpet,books,shelves,furniture,etc. <br /> 2. Budget does not include new pipe insulation. <br /> 3. Budget does not include any removal 1 replacement/patching of walls.(N/A) <br /> 4. Budget does not include any carpentry, cabinet/casework, painting,electrical or HVAC. <br /> 5. Budget does not include any permits,fees,or dumpster rental. <br /> 6. Budget does not include any premium time;figured at regular working hours only(lam—3:30pm) <br /> We appreciate the opportunity to submit this proposal.Please advise if you have any questions. <br /> Respectfully Submitted, <br /> 7X& e4ow <br /> E.L. Pruitt Co. <br /> Estimator/Project Manager <br /> (217)381-8435—mcrowe@elpruitt.com <br /> •plumbing •heating <br /> •air conditioning •sheet metal <br /> •ventilating •fire sprinklers <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.