My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-200 Resolution Authorizing Supplement #1 to the Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc. Section 09-00933-01-BR
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-200 Resolution Authorizing Supplement #1 to the Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc. Section 09-00933-01-BR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 1:18:42 PM
Creation date
9/20/2023 12:45:06 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-200
Res Ord Title
R2023-200 Resolution Authorizing Supplement #1 to the Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc. Section 09-00933-01-BR
Department
Public Works
Approved Date
9/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AtMATERIALS TESTING FEE SCHEDULE (2023) <br /> MILLENNIA PROFESSIONAL SERVICES <br /> CHICAGO"PEORIA`ST.LOUIS <br /> PH(309)321-8141-FAX(309)321-8142 <br /> IDOT/ACI Certified QC/QA PCC/HMA Level 1/II Technician(s)will perform the on-site field testing which includes,but is not limited to, <br /> slump tests,air content tests,making and curing concrete cylinder specimens or beams,and the preparation of field documentation. <br /> Field technicians will also perform inspections and field density tests for compaction and moistures of the soils,backfill material, <br /> aggregate bases and asphalt patching and overlays,as needed,along with preparation of field documentation. <br /> Project Manager(s)will manage the testing,supervise the technicians and review the documentaion. <br /> Vehicle Usage will include mileage to and from the project,including cylinder or beam pick-up and/or trips directly associated <br /> with the project. <br /> Field technician(s)and project manager(s)will not charge overtime to this project. <br /> Units and prices will remain the same for procedures performed after eight(8)working hours,weekends and holidays. <br /> CONCRETE <br /> ACI/IDOT PCC Level I Field Technician $67.50 HR <br /> ACI/IDOT PCC Level II Proportioning Technician $77.50 HR <br /> ACI/IDOT PCC Level III Mix Design Technician $125.00 HR <br /> Concrete Compression Tests-Cylinders $18.50 EA <br /> Concrete Compression Tests-Beams $85.00 EA <br /> Compressive Strength of Mortar Cubes $55.00 EA <br /> Concrete Coring Machine&Generator $250.00 DAY <br /> Grout(Approved Source) Time&Material <br /> Petro ra hic Examination I Upon Request <br /> SOIL <br /> Soils Field Technician 1 $67.50 HR <br /> Soils Field Technician 11 $77.50 HR <br /> Dynamic Cone Penetrometer(DCP) $50.00 DAY <br /> Nuclear Density Gauge $150.00 DAY <br /> Standard Proctor $210.00 EA <br /> Modified Proctor $250.00 EA <br /> Combined Sieve Analysis(Hydrometer&Sieve) $225.00 EA <br /> Moisture Content 1$75.00 1 EA <br /> ASPHALT <br /> HMA Field Technician 1 $67.50 HR <br /> HMA Field Technician II $77.50 HR <br /> HMA Core Density and Thickness $110.00 EA <br /> Nuclear Density Gauge $150.00 UAY <br /> AGGREGATES <br /> Sieve Analysis (Dry/Washed $200.00 SFA <br /> Dry Unit Weight of Aggregates $75.00 __ EA <br /> ' <br /> Standard Proctor $210, EA <br /> Modified Proctor $25Q,; EA <br /> STEEL <br /> Weld Inspection $175.00 HR <br /> Bolt Inspection/Torque Testing $125.00 ! HR <br /> MANAGEMENT <br /> Materials Coordinator $125.00 HR <br /> Pro'ect Manager $180.00 HR <br /> Vehicle Usage-Mileage(mileage rate will fluctuate with current IRS rate $0.75 MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.