My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-200 Resolution Authorizing Supplement #1 to the Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc. Section 09-00933-01-BR
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-200 Resolution Authorizing Supplement #1 to the Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc. Section 09-00933-01-BR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 1:18:42 PM
Creation date
9/20/2023 12:45:06 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-200
Res Ord Title
R2023-200 Resolution Authorizing Supplement #1 to the Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc. Section 09-00933-01-BR
Department
Public Works
Approved Date
9/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a)For progressive payments-Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the <br /> LPA,monthly payments for the work performed shall be due and payable to the ENGINEER,such payments to be <br /> equal to the value of the partially completed work minus all previous partial payments made to the ENGINEER. <br /> (b)Final Payment-Upon approval of the work by the LPA but not later than 60 days after the work is completed and <br /> reports have been made and accepted by LPA and DEPARTMENT,a sum of money equal to the basic fee as <br /> determined in this AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER <br /> shall be due and payable to the ENGINEER. <br /> 5. To pay the ENGINEER as compensation for all services rendered in accordance with the AGREEMENT on the basis of the <br /> following compensation method as discussed in 5-5.10 of the BLR Manual. <br /> Method of Compensation: <br /> Lump Sum <br /> Specific Rate <br /> Cost plus Fixed Fee: <br /> Total Compensation=DL+DC+OH+FF <br /> Where: <br /> DL is the total Direct Labor, <br /> DC is the total Direct Cost, <br /> OH is the firm's overhead rate applied to their DL and <br /> FF is the Fixed Fee. <br /> Where FF=(0.33+R)DL+%SubDL,where R is the advertised Complexity Factor and%SubDL is 10%profit <br /> allowed on the direct labor of the subconsultants. <br /> The Fixed Fee cannot exceed 15%of the DL+OH. <br /> Field Office Overhead Rates:Field rates must be used for construction engineering projects expected to exceed one <br /> year in duration or if the construction engineering contract exceeds$1,000,000 for any project duration. <br /> 6. The recipient shall not discriminate on the basis of race,color,national original or sex in the award and performance of any US <br /> DOT•assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 28.The recipient shall take <br /> all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination In the award and administration of US <br /> DOT-assisted contracts.The recipient's DBE program,as required by 49 CFR part 26 and as approved by US DOT,Is <br /> incorporated by reference in this agreement.Implementation of this program is a legal obligation and failure to carry out its terms <br /> shall be treated as violation of this AGREEMENT.Upon notification to the recipient of its failure to carry out its approved program, <br /> the Department may impose sanctions as provided for under part 26 and may,in appropriate cases,refer the matter for <br /> enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U.S.0 3801 et seq.). <br /> M. IT IS MUTUALLY AGREED, <br /> 1. No work shall be commenced by the ENGINEER prior to issuance by the IDOT of a written Notice to Proceed. <br /> 2. To maintain,for a minimum of 3 years after the completion of the contract,adequate books,records and supporting documents to <br /> verify the amount,recipients and uses of all disbursements of funds passing in conjunction with the contract;the contract and all <br /> books,records and supporting documents related to the contract shall be available for review and audit by the Auditor General, <br /> and the DEPARTMENT,the Federal Highways Administration(FHWA)or any authorized representative of the federal <br /> government,and to provide full access to all relevant materials.Failure to maintain the books,records and supporting documents <br /> required by this section shall establish a presumption in favor of the DEPARTMENT for the recovery of any funds paid by the <br /> DEPARTMENT under the contract for which adequate books,records and supporting documentation are not available to support <br /> their purported disbursement. <br /> 3. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error,omission and/or <br /> negligent act in the prosecution of the ENGINEER's work and shall indemnify and save harmless the LPA,the DEP/+RMTENT, <br /> and their officers,agents,and employees from all suits,claims,actions or damage liabilities,costs or damages of any nature <br /> whatsoever resulting there from.These Indemnities shall not be limited by the listing of any Insurance policy. <br /> The LPA will notify the ENGINEER of any error or omission believed by the LPA to be caused by the negligence of the <br /> ENGINEER as soon as practicable after the discovery.The LPA reserves the right to take immediate action to remedy any error <br /> or omission if notification is not successful;if the ENGINEER fails to reply to a notification;or if the conditions created by the error <br /> or omission are in need of urgent correction to avoid accumulation of additional construction costs or damages to property and <br /> reasonable notice is not practicable. <br /> 4. This AGREEMENT may be terminated by the LPA upon giving notice in writing to the ENGINEER at the ENGINEER's last known <br /> post office address.Upon such termination,the ENGINEER shall cause to be delivered to the LPA all drawings,plats,surveys, <br /> reports,permits,agreements,soils and foundation analysis,provisions,specifications,partial and completed estimates and data, <br /> if any from soil survey and subsurface investigation with the understanding that all such material becomes the property of the LPA <br /> .The LPA will be responsible for reimbursement of all eligible expenses incurred under the terms of this AGREEMENT up to the <br /> date of the written notice of termination. <br /> Completed08l28123 Page 3 of 10 BLR 05530(Rev.07108122) <br />
The URL can be used to link to this page
Your browser does not support the video tag.