My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-206 Resolution Authorizing a Highway Authority Agreement and Environmental Indemnity Agreement between the City of Decatur and Ameren Illinois for Portions of the City Right of Way on Wood Street and Industry Court
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-206 Resolution Authorizing a Highway Authority Agreement and Environmental Indemnity Agreement between the City of Decatur and Ameren Illinois for Portions of the City Right of Way on Wood Street and Industry Court
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:24:04 PM
Creation date
10/4/2023 2:23:59 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-206
Res Ord Title
R2023-206 Resolution Authorizing a Highway Authority Agreement and Environmental Indemnity Agreement between the City of Decatur and Ameren Illinois for Portions of the City Right of Way on Wood Street and Industry Court
Department
Public Works
Approved Date
10/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Attached as Exhibit C is a scaled map prepared by the Owner/Operator showing the area of the <br /> Highway Authority's right-of-way that is governed by this agreement("Right-of-Way"). Because Exhibit C is <br /> not a surveyed plat, the Right-of-Way boundary may be an approximation of the actual Right-of-Way lines. <br /> 6. [Use this paragraph if samples have not been collected within the Right-of-Way, sampling within the <br /> Right-of-Way is not practical, and contamination does not extend beyond the Right-of-Way.] Because the <br /> collection of samples within the Right-of-Way is not practical, the Parties stipulate that, based on modeling, <br /> soil and groundwater contamination exceeding Tier 1 residential remediation objectives does not and will <br /> not extend beyond the boundaries of the Right-of-Way. <br /> 7. The Highway Authority stipulates it has jurisdiction over the Right-of-Way that gives it sole control over the <br /> use of the groundwater and access to the soil located within or beneath the Right-of-Way. <br /> 8. The Highway Authority agrees to prohibit within the Right-of-Way all potable and domestic uses of <br /> groundwater exceeding Tier 1 residential remediation objectives. <br /> 9. The Highway Authority further agrees to limit access by itself and others to soil within the Right-of-Way <br /> exceeding Tier 1 residential remediation objectives. Access shall be allowed only if human health <br /> (including worker safety)and the environment are protected during and after any access.The Highway <br /> Authority may construct, reconstruct, improve, repair, maintain and operate a highway upon the Right-of-Way, <br /> or allow others to do the same by permit. In addition,the Highway Authority and others using or working in <br /> the Right-of-Way under permit have the right to remove soil or groundwater from the Right-of-Way and <br /> dispose of the same in accordance with applicable environmental laws and regulations.The Highway <br /> Authority agrees to issue all permits for work in the Right-of-Way, and make all existing permits for work <br /> in the Right-of-Way, subject to the following or a substantially similar condition: <br /> As a condition of this permit the permittee shall request the office issuing this permit to identify sites in the <br /> Right-of-Way where a Highway Authority Agreement governs access to soil that exceeds the Tier 1 residential <br /> remediation objectives of 35 III.Adm. Code 742. The permittee shall take all measures necessary to protect <br /> human health (including worker safety)and the environment during and after any access to such soil. <br /> 10. This agreement shall be referenced in the Agency's no further remediation determination issued for the <br /> Release(s). <br /> 11.The Agency shall be notified of any transfer of jurisdiction over the Right-of-Way at least 30 days prior to <br /> the date the transfer takes effect. This agreement shall be null and void upon the transfer unless the <br /> transferee agrees to be bound by this agreement as if the transferee were an original party to this <br /> agreement. The transferee's agreement to be bound by the terms of this agreement shall be memorialized <br /> at the time of transfer in a writing ("Rider")that references this Highway Authority Agreement and is signed <br /> by the Highway Authority, or subsequent transferor, and the transferee. <br /> 12.This agreement shall become effective on the date the Agency issues a no further remediation <br /> determination for the Release(s). It shall remain effective until the Right-of-Way is demonstrated to be <br /> suitable for unrestricted use and the Agency issues a new no further remediation determination to reflect <br /> there is no longer a need for this agreement, or until the agreement is otherwise terminated or voided. <br /> 13. In addition to any other remedies that may be available, the Agency may bring suit to enforce the terms <br /> of this agreement or may, in its sole discretion, declare this agreement null and void if any of the Parties <br /> or any transferee violates any term of this agreement. The Parties or transferee shall be notified in writing <br /> of any such declaration. <br /> 14. This agreement shall be null and void if a court of competent jurisdiction strikes down any part or provision <br /> of the agreement. <br /> 15. This agreement supersedes any prior written or oral agreements or understandings between the Parties <br /> on the subject matter addressed herein. It may be altered, modified or amended only upon the written <br /> consent and agreement of the Parties. <br /> 16.Any notices or other correspondence regarding this agreement shall be sent to the Parties at following <br /> addresses: <br />
The URL can be used to link to this page
Your browser does not support the video tag.