My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-218 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavation Company Inc. for the Old King's Orchard Garden, City Project 2023-05
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-218 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavation Company Inc. for the Old King's Orchard Garden, City Project 2023-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 11:46:01 AM
Creation date
10/18/2023 11:32:39 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2023-218
Res Ord Title
R2023-218 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavation Company Inc. for the Old King's Orchard Garden, City Project 2023-05
Department
Public Works
Approved Date
10/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Old King's Orchard Garden <br /> City Project 2023-05 <br /> September 29, 2023 <br /> ADDENDUM NO. 1 <br /> TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> ' OLD KING'S ORCHARD GARDEN <br /> CITY PROJECT 2023-05 <br /> DATED SEPTEMBER 2023 <br /> AD-1-1 NOTICE <br /> 1.01 This Addendum No. 1 dated September 29, 2023, to the Plans, <br /> Specifications and Contract Documents for the above captioned <br /> project, supersedes all contrary and conflicting information of the <br /> above-mentioned bid proposal documents, which are hereby <br /> supplemented in certain particulars as follows: <br /> AD-1-2 BID FORM <br /> 2.01 Replace the Bid Form with the attached Bid Form Add No. 1 adding <br /> Alternate A which is an addition or deduction to the base bid price to <br /> grind the stump and root ball a minimum of 12-inches below final <br /> grade. This will not require full removal of the stump and root ball. <br /> AD-1-3 PREBID MEETING MINUTES <br /> 3.01 Add the attached pre-bid meeting sign-in sheet and meeting minutes <br /> ' from the Pre-Bid Meeting on August 16, 2023 <br /> AD-1-4 SC 16 TREE REMOVAL ALTERNATE A <br /> 4.01 Add in SC 16 TREE REMOVAL ALTERNATE A modifying the <br /> specification for Alternate A allowing an addition or deduction to the <br /> tree removal. The remaining work and payment shall remain the <br /> same <br /> Description: This work shall consist of full tree, stump, and root ball <br /> removal as per the project drawings and standard specifications. The stump <br /> and root ball may be ground down a minimum of 12" below the finish <br /> grade. This work shall include all feeder roots that enlarged to the <br /> surface. The disposal shall be in accordance with Article 202.03 of the <br /> Standard Specifications. Backfill as required from the stump and root ball <br /> removal shall be considered incidental to the earth excavation and <br /> embankment. <br /> ' AD-1-5 SC 17 YARD HYDRANT WITH SERVICE AND METER, 1" <br /> 5.01 Add in in the following to SC 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.