My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-219 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for the William Street Pump Station Improvements Project, City Project 2022-17
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-219 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for the William Street Pump Station Improvements Project, City Project 2022-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 12:25:39 PM
Creation date
10/18/2023 12:03:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-219
Res Ord Title
R2023-219 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for the William Street Pump Station Improvements Project, City Project 2022-17
Department
Public Works
Approved Date
10/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Crawford,Murphy&Tilly <br /> William Street Pump Station,E. Main Street&S.29th Street, Decaur, IL <br /> October 6,2022/IDEAL Number 25115 <br /> ' Limited Asbestos.Inspection Introduction <br /> ' Project Name: William Street Pump Station <br /> Project Location: E.Main Street&S.29th Street <br /> Decaur, IL 62521 <br /> ' Client: Crawford, Murphy &Tilly <br /> Address: 2750 W.Washington Street <br /> City, State Zip: Springfield, IL 62702 <br /> Contact Name: Mr. Ty Besalke <br /> ' Ideal Job Number: 25115 <br /> Inspection Company: Ideal Environmental Engineering, Inc. (IDEAL) <br /> ' Inspector Name: Scott Liescheidt <br /> Inspector ID#: 100-00343 <br /> Inspection Date: October 6, 2022 <br /> ' Purpose of Inspection: Demolition X Renovation Other <br /> ' Scope of The inspection was limited to the sampling of accessible pipe wrap and pipe joints/valve <br /> Work& covering in the following locations, as identified by the client: <br /> Comments: LL-2—Piping at Proposed Meter Location <br /> ' UL-1 —Pump Control Valve 1 <br /> • UL-2—Pump Control Valve 2 <br /> • UL-3—Pump Control Valve 3 <br /> • LL-1 —Tank Fill Valve <br /> ' No other suspect asbestos containing materials were sampled as part of this inspection. If <br /> renovation work is to take place in areas not inspected and/or identified in this report, or if <br /> materials other than those inspected and/or identified in this report will be disturbed, additional <br /> ' inspection is necessary. IDEAL shall not be held responsible for any misunderstanding of <br /> renovation plans. <br /> ' No inspection reports for the building were provided by the client.The review of previous <br /> inspection reports is specifically excluded from the inspection service. IDEAL shall not be held <br /> responsible for any contradictory results in prior inspection reports, should they exist. <br /> ' This report is intended to be read in whole and not in part.The General Definitions and <br /> General Comments are an integral part of this report. <br /> t <br /> A. Ideal Environmental Engineering,Inc. (309)828-4259 www.idealenvironmental.com <br /> Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.