Laserfiche WebLink
SECTION SECTION <br /> NUMBER TITLE PAGE NUMBER <br /> DIVISION- 08 — DOORS AND WINDOWS <br /> 08 62 00 Unit Skylights 08 62 00 1-7 <br /> DIVISION 09 — FINISHES <br /> 09 96 00 High Performance Coatings (Potable Water) 09 96 00 1-16 <br /> DIVISION 22 —PLUMBING ' <br /> 22 05 00 Basic Materials and Methods 22 05 00 1-7 <br /> 22 05 29 Sleeves, Supports, Hangers, Anchors, and Seals 22 05 29 1-10 <br /> 22 1000 Plumbing 22 1000 1-10 <br /> DIVISION 23 — HEATING, VENTILATION AND AIR CONDITIONING <br /> 23 05 00 Basic Mechanical Materials and Methods 23 05 00 1-11 , <br /> 23 05 93 Air Systems Testing, Adjusting, and Balancing 23 05 93 1-4 <br /> 2307 13 Duct Insulation 2307 13 1-5 <br /> 23 11 23 Gas Piping 23 11 23 1-6 <br /> 2331 13 Ductwork 2331 13 1-6 <br /> 23 33 00 Ductwork Accessories 23 33 00 1-8 , <br /> 23 34 00 Power Ventilators 23 34 00 1-6 <br /> 2337 00 Air Inlets and Outlets 2337 00 1-5 <br /> 23 55 00 Gas Fired Heaters 23 55 00 1-7 <br /> DIVISION 26— ELECTRICAL <br /> 2601 26 Testing Electrical Systems 2601 26 1-3 <br /> 2601 28 Maintenance Testing of Electrical Systems 2601 28 1-3 <br /> 26 05 00 Common Work Results for Electrical 26 05 00 1-5 <br /> 26 05 05 Electrical Demolition 26 05 05 1-3 <br /> 2605 19 Low-Voltage Conductors and Cables 26 05 19 1-6 <br /> 26 05 26 Grounding and Bonding for Electrical Systems 26 05 26 1-3 <br /> 26 05 29 Hangers and Supports for Electrical Systems 26 05 29 1-3 <br /> 26 05 33 Raceway and Boxes for Electrical Systems 26 05 33 1-9 <br /> 26 05 53 Identification for Electrical Systems 26 05 53 1-3 <br /> 2609 17 Programmable Logic Control Panel and 10 List 2609 17 1-7 <br /> Decatur/22004435.00 Williams Street Pump Station Improvements <br /> TOC-ii Master TOC <br />