My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 11:35:45 AM
Creation date
11/22/2023 11:30:17 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-250
Res Ord Title
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
Department
Public Works
Approved Date
11/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Illinois Department <br /> of Transportation Check Sheet for Recurring Special Provisions <br /> Local Public Agency County Section Number <br /> City of Decatur Macon 22-00237-00-IC <br /> ❑ Check this box for lettings prior to 01/01/2023. <br /> The Following Recurring Special Provisions Indicated By An"X"Are Applicable To This Contract And Are Included By Reference: <br /> Recurring Special Provisions <br /> Check Sheet# Page No. <br /> 1 ❑ Additional State Requirements for Federal-Aid Construction Contracts 53 <br /> 2 ❑ Subletting of Contracts(Federal-Aid Contracts) 56 <br /> 3 ❑ EEO 57 <br /> 4 ❑ Specific EEO Responsibilities Non Federal-Aid Contracts 67 <br /> 5 ❑ Required Provisions-State Contracts 72 <br /> 6 ❑ Asbestos Bearing Pad Removal 78 <br /> 7 ❑ Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 79 <br /> 8 ❑ Temporary Stream Crossings and In-Stream Work Pads 80 <br /> 9 ❑ Construction Layout Stakes 81 <br /> 10 ❑ Use of Geotextile Fabric for Railroad Crossing 84 <br /> 11 ❑ Subsealing of Concrete Pavements 86 <br /> 12 ❑ Hot-Mix Asphalt Surface Correction 90 <br /> 13 ❑ Pavement and Shoulder Resurfacing 92 <br /> 14 ❑ Patching with Hot-Mix Asphalt Overlay Removal 93 <br /> 15 ❑ Polymer Concrete 95 <br /> 16 ❑ Reserved 97 <br /> 17 ❑ Bicycle Racks 98 <br /> ' 18 ❑ Temporary Portable Bridge Traffic Signals 100 <br /> 19 ❑ Nighttime Inspection of Roadway Lighting 102 <br /> 20 ❑ English Substitution of Metric Bolts 103 <br /> 21 ❑ Calcium Chloride Accelerator for Portland Cement Concrete 104 <br /> 22 ❑ Quality Control of Concrete Mixtures at the Plant 105 <br /> 23 ❑ Quality Control/Quality Assurance of Concrete Mixtures 113 <br /> ' 24 ❑ Reserved 129 <br /> 25 ❑ Reserved 130 <br /> ' 26 ❑ Temporary Raised Pavement Markers 131 <br /> 27 ❑ Restoring Bridge Approach Pavements Using High-Density Foam 132 <br /> 28 ❑ Portland Cement Concrete Inlay or Overlay 135 <br /> ' 29 ❑ Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 139 <br /> 30 ❑ Longitudinal Joint and Crack Patching 142 <br /> 31 ❑ Concrete Mix Design-Department Provided 144 <br /> 32 ❑ Station Numbers in Pavements or Overlays 145 <br /> 1 <br /> 1 <br /> ' Printed 09/13/23 Page 1 of 2 BLR 11300(Rev. 10/25/22) <br />
The URL can be used to link to this page
Your browser does not support the video tag.