My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 11:35:45 AM
Creation date
11/22/2023 11:30:17 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-250
Res Ord Title
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
Department
Public Works
Approved Date
11/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br /> SP-5 CONTAMINANT CONTROL AND INLET PROTECTION <br /> Description: Care should be used to help minimize any sediment or other fine materials <br /> Y <br /> leaving the job site. Any open inlet or catch basin shall be protected from sediment infiltration <br /> using the standards outlined in the Illinois Urban Manual for INLET PROTECTION or by using an <br /> equivalent approved by the Engineer. Inlets shall be protected before any sawing, excavation, or <br /> pavement removal commences. Concrete shall be washed out in an approved lined container that <br /> complies with the Illinois Urban Manual standards. <br /> ' Basis of Payment: All labor and materials necessary to install inlet protection shall be paid <br /> for at the contract unit price per EACH for INLET AND PIPE PROTECTION. Concrete washout <br /> areas will not be paid for separately but shall be considered as included with other concrete pay <br /> ' items. <br /> SP-6 SCHEDULE OF WORK <br /> Description: The General Contractor and All Sub-Contractors shall furnish in writing, or <br /> electronic form, a weekly schedule by 12:00 P.M., Thursday, prior to the week being scheduled, so <br /> ' all media, safety services and other divisions can be notified. All work shall be approved by the <br /> Engineer. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be considered <br /> as included with the various work items involved. <br /> SP-7 SIDEWALKS, CURBS,AND CURB RAMPS <br /> Description: Any potential trip hazards greater than 1/4" cannot be left when opening the <br /> ' sidewalk to pedestrian traffic. If needed, temporary ramp material may be used to fill in the gap left <br /> prior to complete the various other work items. All excavation necessary to set curb and sidewalk at <br /> the proper grades to achieve ADA compliance will be considered included in the corresponding <br /> work items. <br /> Basis of Payment: Sidewalk work will be considered included with applicable sidewalk <br /> pay items. <br /> SP-8 UTILITIES TO BE ADJUSTED <br /> Description: This work will consist of adjusting manholes and inlets in accordance with <br /> Sections 602 of the Standard Specifications and as modified herein. <br /> Trench backfill: When the utility falls within 2 feet of the proposed pavement, curb & <br /> gutter, or sidewalk, compacted CA-6 or a Controlled Low-Strength Material shall be used according <br /> to Section 1019 of the Standard Specifications. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.