Contractor's yard or another job and the cost to re-mobilize, whichever is less. <br /> Rental equipment may be paid for longer than two weeks provided the Contractor ' <br /> presents adequate support to the Department (including lease agreement) to show <br /> retaining equipment on the job is the most economical course to follow and in the <br /> public interest. <br /> (3) Reduced Rate of Production Delay. The Contractor will be compensated for the <br /> reduced productivity for labor and equipment time in excess of the 25 percent <br /> threshold for that portion of the delay in excess of seven calendar days. <br /> Determination of compensation will be in accordance with Article 104.02, except <br /> labor and material additives will not be permitted. <br /> Payment for escalated material costs, escalated labor costs, extended project overhead, <br /> and extended traffic control will be determined according to Article 109.13." <br /> Revise Article 108.04(b) of the Standard Specifications to read: <br /> "(b) No working day will be charged under the following conditions. <br /> (1) When adverse weather prevents work on the controlling item. <br /> (2) When job conditions due to recent weather prevent work on the controlling item. <br /> (3) When conduct or lack of conduct by the Department or its consultants, <br /> representatives, officers, agents, or employees; delay by the Department in making <br /> the site available; or delay in furnishing any items required to be furnished to the <br /> Contractor by the Department prevents work on the controlling item. <br /> (4) When delays caused by utility or railroad adjustments prevent work on the controlling ' <br /> item. <br /> (5) When strikes, lock-outs, extraordinary delays in transportation, or inability to procure <br /> critical materials prevent work on the controlling item, as long as these delays are not <br /> due to any fault of the Contractor. ' <br /> (6) When any condition over which the Contractor has no control prevents work on the <br /> controlling item." , <br /> Revise Article 109.09(f) of the Standard Specifications to read: <br /> "(f) Basis of Payment. After resolution of a claim in favor of the Contractor, any adjustment ' <br /> in time required for the work will be made according to Section 108. Any adjustment in <br /> the costs to be paid will be made for direct labor, direct materials, direct equipment, <br /> direct jobsite overhead, direct offsite overhead, and other direct costs allowed by the <br /> resolution. Adjustments in costs will not be made for interest charges, loss of anticipated <br /> profit, undocumented loss of efficiency, home office overhead and unabsorbed overhead <br />