My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 11:35:45 AM
Creation date
11/22/2023 11:30:17 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-250
Res Ord Title
R2023-250 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for the William Street Railroad Crossing Closure Project, City Project 2022-37, Section No. 22-00237-00-IC
Department
Public Works
Approved Date
11/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes: <br /> 1/ Seeding shall be performed when the ambient temperature has been between 45 IF <br /> (7°C) and 80 IF(27 °C)for a minimum of seven (7) consecutive days and is forecasted <br /> to be the same for the next five (5) days according to the National Weather Service. <br /> 2/ Seeding shall be performed in late fall through spring beginning when the ambient <br /> temperature has been below 45 OF (7 °C) for a minimum of seven (7) consecutive days <br /> and ending when the ambient temperature exceeds 80 OF (27°C) according to the <br /> National Weather Service. <br /> 3/ Specific variety as shown in the plans or approved by the Engineer. <br /> 4/ Inoculation required. <br /> 5/ Pure Live Seed (PLS) shall be used. <br /> 6/ Fertilizer shall not be used. <br /> 7/ Seed shall be primed with KNOB to break dormancy and dyed to indicate such. <br /> Seeding will be inspected after a period of establishment. The period of establishment shall <br /> be six (6) months minimum, but not to exceed nine (9) months. After the period of establishment, <br /> areas not exhibiting 75 percent uniform growth shall be interseeded or reseeded, as determined <br /> by the Engineer, at no additional cost to the Department." <br /> 80445 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.