Laserfiche WebLink
RETURN WITH BID <br /> CITY OF DECATUR, ILLINOIS <br /> DEPARTMENT OF PUBLIC WORKS <br /> for <br /> 2023 Annual Manhole Rehabilitation Project <br /> CITY PROJECT 2023-14 <br /> Bidder will complete the Work in accordance with the Contract Documents for the following bid prices: <br /> ASE BID <br /> ' WORK PAY <br /> ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENSION <br /> 1 EMENTITIOUS LINER, 1.5"THICK V.L.F ""' $176.00 <br /> $66,580.80 <br /> z SAMPLE MATERIAL TESTING EACH 10 $80.00 <br /> 800.00 <br /> 3 MANHOLES TO BE RECONSTRUCTED WITH EACH 19 <br /> NEW FRAME AND GRATE IN PAVEMENT $2,100.00 $39,900.00 <br /> 4 MANHOLES TO BE RECONSTRUCTED WITH EACH 7 $975.00 <br /> NEW FRAME AND GRATE IN SOD/GRAVEL $6,825.00 <br /> 5 MANHOLE CHIMNEY SEAL EACH 46 $280.00 <br /> $12,880.00 <br /> 6 BENCHWALL TO BE CONSTRUCTED EACH 16 $365.00 $5,840.00 <br /> 1 7 ALTERATIONS,CANCELLATIONS, L.S. 1 $20,000.00 $20,000.00 <br /> XTENSIONS,DEDUCTIONS AND EXTRA <br /> WORK <br /> TOTAL BASE BID $152,825.80 <br /> TOTAL BASE BID IN WORDS One Hundred Fifty-Two Thousand Eight Hundred Twenty-Five Dollars and Eighty Cents <br /> The BIDDER agrees to accept as full payment for the work proposed as an additive or deductive <br /> alternate under this project as herein specified and as shown on the Drawings, based upon the <br /> undersigned's own estimate of quantities and costs and the following Alternate Bid Item Price. The <br /> ' BIDDER agrees that the alternate bid item price represents a true measure of the labor and materials <br /> required to perform the Work, including all allowances for overhead and profit for each type and unit <br /> of work called for in these Contract Documents. <br /> Additive or Deductive Alternate Bid prices are not to be included in the Total Lump Sum Bid Amount. <br /> The Owner may or may not accept any or all of the Additive or Deductive alternate bid items.with the <br /> ' base bid work at the owner's sole discretion. <br /> 19 <br />