Laserfiche WebLink
Lake Decatur Watershed Management Plan—Phase V Scope of Services& Budget <br /> o Water quality monitoring will continue in partnership with ISWS approximately bi-weekly at the three <br /> stations established in late 2019. Locations include, (i)Sangamon River IL 32, (ii) Friends Creek and (iii) <br /> Big/Long Creek. During larger storm events, attempts will be made to directly measure flows with <br /> acoustic doppler profiler methods to calibrate and maintain stage/discharge relationships. <br /> o Automatic water sampling equipment was installed at the 3 stations in Phase IV to better capture <br /> storm events. These samplers will be maintained and managed to capture 4-5 storm events per year <br /> during Phase V. Samples are submitted to the ISWS laboratory or RCPP partners(i.e., Decatur Sanitary <br /> District) for analysis. <br /> 2. Continuous Monitoring <br /> o Northwater will continue to support management of the automatic monitoring station on the <br /> Sangamon River at the IL 32 bridge. This is in partnership with the National Great Rivers Research and <br /> Education Center (NGRREC) and includes river stage, nitrate, turbidity, temperature/conductivity, <br /> dissolved oxygen and dissolved organic matter. The monitoring sensors, telemetry and solar power <br /> system was purchased under phase II and installation was completed in 2022. <br /> o On behalf of the City, Northwater will coordinate with NGRREC in the maintenance and operation of <br /> the system to minimize downtime. Data will be regularly checked with QA/QC procedures to make <br /> sure the station and sensors are in in working order and data quality is satisfactory. <br /> o BMP Monitoring sites <br /> ■ DeWitt Well Field — Baseline monitoring to characterize stormwater and drainage tile flows <br /> and sediment and nutrient concentrations. Northwater is in discussions with NGRRECto install <br /> automatic water sampling equipment in Phase V to better capture storm events. <br /> ■ The budget includes baseline monitoring at one additional BMP site to start in Phase V,which <br /> will be determined during Phase IV or early Phase V. <br /> 3. Data Management <br /> o Monitoring data will be managed and maintained in a relational database system using MS Access. A <br /> database architecture has been developed in coordination with the ISWS to make synthesizing data <br /> between organizations more efficient. <br /> o Northwater will utilize tools and processes for data validation and QA/QC of sensor data. <br /> o Online access to sensor and telemetry data will be maintained by Northwater, this includes all <br /> telemetry and server related-costs. <br /> o Managing and maintaining data will be an on-going and important part of the monitoring program. <br /> �'�"' n©rthwater <br />