My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-259 Resolution Authorizing Amendment No. 4 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-259 Resolution Authorizing Amendment No. 4 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 10:40:44 AM
Creation date
12/12/2023 10:40:30 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-259
Res Ord Title
R2023-259 Resolution Authorizing Amendment No. 4 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
Department
Public Works
Approved Date
12/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Decatur Watershed Management Plan—Phase V Scope of Services& Budget <br /> o Water quality monitoring will continue in partnership with ISWS approximately bi-weekly at the three <br /> stations established in late 2019. Locations include, (i)Sangamon River IL 32, (ii) Friends Creek and (iii) <br /> Big/Long Creek. During larger storm events, attempts will be made to directly measure flows with <br /> acoustic doppler profiler methods to calibrate and maintain stage/discharge relationships. <br /> o Automatic water sampling equipment was installed at the 3 stations in Phase IV to better capture <br /> storm events. These samplers will be maintained and managed to capture 4-5 storm events per year <br /> during Phase V. Samples are submitted to the ISWS laboratory or RCPP partners(i.e., Decatur Sanitary <br /> District) for analysis. <br /> 2. Continuous Monitoring <br /> o Northwater will continue to support management of the automatic monitoring station on the <br /> Sangamon River at the IL 32 bridge. This is in partnership with the National Great Rivers Research and <br /> Education Center (NGRREC) and includes river stage, nitrate, turbidity, temperature/conductivity, <br /> dissolved oxygen and dissolved organic matter. The monitoring sensors, telemetry and solar power <br /> system was purchased under phase II and installation was completed in 2022. <br /> o On behalf of the City, Northwater will coordinate with NGRREC in the maintenance and operation of <br /> the system to minimize downtime. Data will be regularly checked with QA/QC procedures to make <br /> sure the station and sensors are in in working order and data quality is satisfactory. <br /> o BMP Monitoring sites <br /> ■ DeWitt Well Field — Baseline monitoring to characterize stormwater and drainage tile flows <br /> and sediment and nutrient concentrations. Northwater is in discussions with NGRRECto install <br /> automatic water sampling equipment in Phase V to better capture storm events. <br /> ■ The budget includes baseline monitoring at one additional BMP site to start in Phase V,which <br /> will be determined during Phase IV or early Phase V. <br /> 3. Data Management <br /> o Monitoring data will be managed and maintained in a relational database system using MS Access. A <br /> database architecture has been developed in coordination with the ISWS to make synthesizing data <br /> between organizations more efficient. <br /> o Northwater will utilize tools and processes for data validation and QA/QC of sensor data. <br /> o Online access to sensor and telemetry data will be maintained by Northwater, this includes all <br /> telemetry and server related-costs. <br /> o Managing and maintaining data will be an on-going and important part of the monitoring program. <br /> �'�"' n©rthwater <br />
The URL can be used to link to this page
Your browser does not support the video tag.