My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-259 Resolution Authorizing Amendment No. 4 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-259 Resolution Authorizing Amendment No. 4 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 10:40:44 AM
Creation date
12/12/2023 10:40:30 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-259
Res Ord Title
R2023-259 Resolution Authorizing Amendment No. 4 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
Department
Public Works
Approved Date
12/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Decatur Watershed Management Plan—Phase V Scope of Services& Budget <br /> It is anticipated that Northwater will support the City with the following: <br /> 1. Coordination and management with partners and USDA. <br /> 2. Partner and contribution tracking/auditing. <br /> 3. Targeted landowner outreach and field-level conservation planning. <br /> a. To be led by the Technical Service Providers (TSPS) with limited Northwater support. <br /> 4. Outcome measurement and tracking. <br /> 5. Program expansion, engage additional partners and improving capacity. <br /> 6. Program promotion and presentations. <br /> 7. General oversight and project management. <br /> Task 5.6: Watershed Coordination & Plan impiementation <br /> Northwater will work with the City and others to implement completed subwatershed plans and enhance/expand the <br /> City-funded cost-share program. This will include: <br /> 1. Provide guidance and training to City staff. <br /> 2. Support the City in conducting strategic one-on-one landowner outreach to forward critical practices on private <br /> property identified in the plan(s). <br /> 3. Develop landowner concept BMP plans and cost-estimates to facilitate landowner agreement (pre survey & <br /> design phase). <br /> 4. Work with partners to advance projects prioritized on City-owned property. This includes wetlands, re- <br /> connecting streams to their floodplains, prairie restoration, and urban BMPs. <br /> Task 5.7: Special Project Advancement <br /> During previous phases,special projects and initiatives were identified with a goal to generate significant water quality <br /> benefits to the lake and watershed with the ability to leverage other state and federal funds. Some of these projects <br /> included: <br /> 1. Anchored floating treatment wetlands to optimize sediment traps in Lake Decatur. <br /> 2. Reconnection of Sangamon River to floodplain to increase sediment storage in floodplain and reduce yield <br /> to Lake Decatur. <br /> 3. Specialty crops,fertilizer field trials, treatment wetland and erosion control at the DeWitt well field. <br /> 4. Conservation practices on City-owned farmland. <br /> 5. Carbon and water quality trading pilot program. <br /> W northwater <br />
The URL can be used to link to this page
Your browser does not support the video tag.