Laserfiche WebLink
' Water Sampling Stations, City Project 2023-13 <br /> Questions <br /> November 9, 2023 <br /> 1. QUESTION: Will the City require the pressure sensors to be connected to the <br /> ' internet? <br /> ANSWER: The pressure sensors provided by Mueller come with cellular <br /> connectivity. The contractor does not need to arrange for any further internet <br /> connectivity. <br /> 2. QUESTION: On the water sampling station that is to be directly supplied to the City <br /> of Decatur, are we only supplying the Mueller Station? Or are we required to provide <br /> the corp, curb stop,piping, etc. that goes from station to existing watermain? <br /> ANSWER: The spare water sampling station is to include only the sampling station <br /> itself and no appurtenances. <br /> 1 3. QUESTION: On the section drawings it actually shows 20 locations to install, I'm <br /> assuming 1 of these represents the spare location? Is it Sampling Station#8? <br /> ANSWER: Correct. Sampling Station#8 is located within the City's Municipal <br /> Service Center. There is an existing sampling station there, so the 20d' sampling <br /> station is to be a spare. <br /> 4. QUESTION: What size is the existing watermain that we tie-in to going to be <br /> ' generally? Are we talking 6"-12" in all cases or is there bigger watermain that we are <br /> tapping? <br /> ANSWER: All of the watermains that are to be tapped for the water sampling stations <br /> 1 are 12" in diameter or less, except two: Station#2, on W. Southside Drive, which is <br /> 18"; and Station#6 on N. 22nd Street, which is 16". <br />