My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 11:26:19 AM
Creation date
12/12/2023 11:08:41 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-261
Res Ord Title
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
Department
Public Works
Approved Date
12/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bidder RFPs and Responses Part 2 <br /> 1. Could you please verify if they are supposed to use boots for the storm structures?This will <br /> significantly impact the cost of said structures, if so. <br /> Yes, based on concerns expressed during design, this sewer is required to have "boots" <br /> similar to a sanitary sewer structure. <br /> 2. This is 02633-3, 2.1.C. spec section for Manholes: <br /> .Uq U11U1I IG'RS UI M01 IY1 %,1-40. <br /> C. Sewer pipe to Manhole C;o inec:ions.All connections shall prov de for a watertight seal <br /> De.ween the pipe and manhole. <br /> To connect a sewer to a marhole, a flexible boot, flexible connector, or a cast-m- <br /> place gasket shall be used. Flexible connectors. including inflatable gaskets. <br /> shall be in accordance wth ASTM C923. <br /> a. KOR-N-SEAL flex ble boot. <br /> b. Dura-seal gaskets <br /> C. A" Lok Gasket <br /> d. Or Equal <br /> Agree, provide as specified. <br /> 3. 1 know you mention temporary fencing as well, are you envisioning a temporary fence around <br /> the whole perimeter of the project like chain link or is snow fencing acceptable? <br /> Snow fence is acceptable ana shall remain up in areas until trench is backfilled. <br /> 4. Just to confirm,we are replacing sidewalk with just aggregate correct? If we damage more <br /> concrete sidewalk than shown for removals we can just replace the damaged areas with <br /> aggregate as well? <br /> iAdditional existing sidewalk damaged within the work area between approx. stations <br /> 8+20 and 9+10 can be replaced with aggregate trail at no cost to the owner. Damage to <br /> other sidewalk shall be replaced with material to match existing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.