§9.9.2 Shop Drawings,Product Data,Samples and similar submittals are not Contract Documents.
<br /> §9.9.3 The Contractor shall not be required to provide professional services that constitute the practice of
<br /> architecture or engineering unless such services are specifically required by the Contract Documents or unless the
<br /> Contractor needs to provide such services in order to carry out the Contractor's own responsibilities.If professional
<br /> design services or certifications by a design professional are specifically required,the Owner and the Architect will
<br /> specify the performance and design criteria that such services must satisfy.The Contractor shall cause such services
<br /> or certifications to be provided by an appropriately licensed design professional.If no criteria are specified,the
<br /> design shall comply with applicable codes and ordinances.Each Party shall be entitled to rely upon the information
<br /> provided by the other Party.The Architect will review and approve or take other appropriate action on submittals for
<br /> the limited purpose of checking for conformance with information provided and the design concept expressed in the
<br /> Contract Documents.The Architect's review of Shop Drawings,Product Data,Samples,and similar submittals shall
<br /> be for the limited purpose of checking for conformance with information given and the design concept expressed in
<br /> the Contract Documents.In performing such review,the Architect will approve,or take other appropriate action
<br /> upon,the Contractor's Shop Drawings,Product Data,Samples,and similar submittals.
<br /> §9.10 Use of Site
<br /> The Contractor shall confine operations at the site to areas permitted by applicable laws,statutes,ordinances,codes,
<br /> rules and regulations,lawful orders of public authorities,and the Contract Documents and shall not unreasonably
<br /> encumber the site with materials or equipment.
<br /> §9.11 Cutting and Patching
<br /> The Contractor shall be responsible for cutting,fitting,or patching required to complete the Work or to make its
<br /> parts fit together properly.
<br /> §9.12 Cleaning Up
<br /> The Contractor shall keep the premises and surrounding area free from accumulation of waste materials and rubbish
<br /> caused by operations under the Contract.At completion of the Work,the Contractor shall remove waste materials,
<br /> rubbish,the Contractor's tools,construction equipment,machinery,and surplus material from and about the Project.
<br /> §9.13 Access to Work
<br /> The Contractor shall provide the Owner and Architect with access to the Work in preparation and progress wherever
<br /> located.
<br /> §9.14 Royalties,Patents and Copyrights
<br /> The Contractor shall pay all royalties and license fees.The Contractor shall defend suits or claims for infringement
<br /> of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof,but
<br /> shall not be responsible for defense or loss when a particular design,process,or product of a particular manufacturer
<br /> or manufacturers is required by the Contract Documents or where the copyright violations are contained in
<br /> Drawings,Specifications or other documents prepared by the Owner or Architect.However,if an infringement of a
<br /> copyright or patent is discovered by,or made known to,the Contractor,the Contractor shall be responsible for the
<br /> loss unless the information is promptly furnished to the Architect.
<br /> §9.15 Indemnification
<br /> §9.15.1 To the fullest extent permitted by law,the Contractor shall indemnify and hold harmless the Owner,
<br /> Architect,Architect's consultants,and agents and employees of any of them from and against claims,damages,
<br /> losses and expenses,including but not limited to attorneys'fees,arising out of or resulting from performance of the
<br /> Work,provided that such claim,damage,loss,or expense is attributable to bodily injury,sickness,disease or death,
<br /> or to injury to or destruction of tangible property(other than the Work itself),but only to the extent caused by the
<br /> negligent acts or omissions of the Contractor,a Subcontractor,anyone directly or indirectly employed by them,or
<br /> anyone for whose acts they may be liable,regardless of whether or not such claim,damage,loss,or expense is
<br /> caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate,abridge,or reduce
<br /> other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Section
<br /> 9.15.1.
<br /> Init. AIA Document A104—2017(formerly A107TM—2007).Copyright©1936,1951,1958,1961,1963,1966,1970,1974,1978,1987,1997,2007 and 2017.All
<br /> rights reserved.'The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of 12
<br /> The American Institute of Architects.This document was produced at 14:33:21 CT on 01/31/2024 under Order No.3104238599 which expires on 05/21/2024,is
<br /> not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright
<br /> violations,e-mail docinfo@aiacontracts.com.
<br /> User Notes: (3139ADA313)
<br />
|