The Contractor shall comply with,and give notices required by,applicable laws,statutes,ordinances,codes,rules
<br /> and regulations,and lawful orders of public authorities bearing on safety of persons and property and their
<br /> protection from damage,injury,or loss.The Contractor shall promptly remedy damage and loss to property caused
<br /> in whole or in part by the Contractor,a Subcontractor,a sub-subcontractor,or anyone directly or indirectly
<br /> employed by any of them,or by anyone for whose acts they may be liable and for which the Contractor is
<br /> responsible under Sections 16.1.2 and 16.1.3.The Contractor may make a claim for the cost to remedy the damage
<br /> or loss to the extent such damage or loss is attributable to acts or omissions of the Owner or Architect or by anyone
<br /> for whose acts either of them may be liable,and not attributable to the fault or negligence of the Contractor.The
<br /> foregoing obligations of the Contractor are in addition to the Contractor's obligations under Section 9.15.
<br /> §16.2 Hazardous Materials and Substances
<br /> §16.2.1 The Contractor is responsible for compliance with the requirements of the Contract Documents regarding
<br /> hazardous materials or substances.If the Contractor encounters a hazardous material or substance not addressed in
<br /> the Contract Documents,and if reasonable precautions will be inadequate to prevent foreseeable bodily injury or
<br /> death to persons resulting from a material or substance,including but not limited to asbestos or polychlorinated
<br /> biphenyl(PCB),encountered on the site by the Contractor,the Contractor shall,upon recognizing the condition,
<br /> immediately stop Work in the affected area and notify the Owner and Architect of the condition.When the material
<br /> or substance has been rendered harmless,Work in the affected area shall resume upon written agreement of the
<br /> Owner and Contractor.By Change Order,the Contract Time shall be extended appropriately and the Contract Sum
<br /> shall be increased in the amount of the Contractor's reasonable additional costs of shutdown,delay,and start-up.
<br /> §16-2.2 TO the AdIeSt eXtefit PeFfflitted by law,the Owner-shall indemnify and held haR;nless the Centfaeter-,
<br /> elaims,damages,losses,and expenses,ineltiding bot not limited te a4temeys' fees,afising out of or-r-esulting 4e
<br /> death as deser-ibed in Seetion 16.2.1 and has not h-e-em r-ender-ed haFmless,provided that sueh elaim,damage,less,a
<br /> expense is attr-ibtttable to bodily i*i:y,siekness,disease or-death,or-to if��to or-destnaetion of ta*gible pr-ope
<br /> (other-than the Work itself),exeept to the e*teat that sueh damage,less,or-expense is due to the fault or-negligenee
<br /> of the pafty seeking ind
<br /> §16.2.3 If,without negligence on the part of the Contractor,the Contractor is held liable by a government agency for
<br /> the cost of remediation of a hazardous material or substance solely by reason of performing Work as required by the
<br /> Contract Documents,the Owner shall indemnify the Contractor for all cost and expense thereby incurred.
<br /> ARTICLE 17 INSURANCE AND BONDS
<br /> §17.1 Contractor's Insurance
<br /> §17.1.1 The Contractor shall purchase and maintain insurance of the types and limits of liability,eapAaiaiag the
<br /> \xladE as Vet f Ftl,i. Seetien 1 Q.^,onless a,1 FF t dur-ation is stated b- ' .liability as required in Exhibit A.
<br /> §17.1.2 Gemmer-eial general Liability insur-anee for-the Pfejeet written an an eeetffenee fefm with peliey limits e
<br /> *et less than($)eaeh eeetiffenee,($)general aggregate,afid aggfegate for pr-edttets eempleted eper-ati
<br /> A damages beeatise of bodily if��,siekaess or-disease,itteludifig eeetipational siekness or-disease,and
<br /> death of any per-son;
<br /> .2 personal a-ad a&ei4isiag
<br /> sueh -aPeFTTt..
<br /> bedily incur-y er.« efty damageµ..s nb t F eampleted oper-ations; ,1
<br /> `J
<br /> Inst. AIA Document A104—2017(formerly A107-—2007).Copyright @ 1936,1951,1958,1961,1963,1966,1970,1974,1978,1987,1997,2007 and 2017.All
<br /> rights reserved.'The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents'are trademarks of 19
<br /> The American Institute of Architects.This document was produced at 14:33:21 CT on 01/31/2024 under Order No.3104238599 which expires on 05/21/2024,is
<br /> not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright
<br /> violations,e-mail docinfo@aiacontracts.com.
<br /> User Notes: (3139ADA31D)
<br />
|