Laserfiche WebLink
PROJECT MANUAL PAGE 17 <br /> DEFECT ASSESSMENT <br /> A. Replace Work or portions of the Work not complying with specified requirements. <br /> B. If, in the opinion of Owner, it is not practical to remove and replace the work, Owner will direct <br /> an appropriate remedy or adjust payment. <br /> TEMPORARY UTILITIES <br /> TEMPORARY ELECTRICITY <br /> A. Contractor may use the permanent installed transformers and services for temporary service. <br /> B. Provide power outlets for construction operations, with branch wiring and distribution boxes <br /> located as required. Provide flexible power cords as required. <br /> C. Permanent convenience receptacles may be utilized during construction. <br /> TEMPORARY LIGHTING <br /> A. Provide and maintain lighting for construction operations to achieve a minimum lighting level <br /> of 2 watt/sq ft. <br /> B. Provide branch wiring from power source to distribution boxes with lighting conductors, <br /> pigtails, and lamps as required. <br /> C. Maintain lighting and provide routine repairs. <br /> D. Permanent building lighting may be utilized during construction. <br /> TEMPORARY HEATING <br /> A. Provide heating devices and heat as needed to maintain specified conditions for construction <br /> operations. <br /> B. Maintain minimum ambient temperature of 50 degrees F in areas where construction is in <br /> progress, unless indicated otherwise in specifications. <br /> TEMPORARY COOLING <br /> A. Provide cooling devices and cooling as needed to maintain specified conditions for construction <br /> operations. <br /> B. Maintain maximum ambient temperature of 80 degrees F in areas where construction is in <br /> progress, unless indicated otherwise in specifications. <br /> COD 2023-26A AEX 6541 <br />