Laserfiche WebLink
Page 3 <br /> January 31,2024 <br /> The library will see other improvements as result of this project, including: <br /> • New chilled water pumps with variable speed drives. <br /> • Capped piping tees for the future heat recovery option. <br /> • A buffer tank will be installed to increase system volume and prevent issues from chiller short cycling. <br /> • A walk-able platform around the AFC for ease of maintenance. <br /> • The decommissioned boiler is being removed from the building while a crane is on site for the new work. <br /> • New equipment integrated with the building automation system(BAS)for remote monitoring&alerts. <br /> Sincerely, <br /> ARCHITECTURAL EXPRESSIONS,LLP <br /> ?Qty <br /> PATRICK CORRIGAN,PE <br /> Enclosure <br />