Laserfiche WebLink
Exhibit C <br /> DIRECT HOURLY LABOR COSTS <br /> As of the date of this contract. <br /> Project Name: Downtown Parking Structure -Franklin St and William St <br /> Contractor/Consultant: Walker Consultants <br /> Classification Minimum Maximum <br /> Principal/Vice President 290 310 <br /> Sr. Project Manager 270 <br /> Project Manager 235 <br /> Senior Engineer 230 <br /> Engineer 215 <br /> Senior Technician 180 <br /> Technician 165 <br /> Sr. Administrative Assistant 140 <br /> Administrative Assistant 120 <br /> Exhibit C-1 <br />