My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:54 AM
Creation date
2/8/2024 3:42:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-27
Res Ord Title
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LR 109-2 <br /> Page 2 of 3 <br /> For HMA mixtures measured in square yards: Q, tons = A x D x (Gmb x 46.8) / 2000. For HMA <br /> mixtures measured in square meters: Q, metric tons = A x D x (Gmb x 1) / 1000. When computing <br /> adjustments for full-depth HMA pavement, separate calculations will be made for the binder and <br /> surface courses to account for their different Gmb and % ACS, <br /> For bituminous materials measured in gallons: Q, tons = V x 8.33 Ib/gal x SG /2000 <br /> For bituminous materials measured in liters: Q, metric tons = V x 1.0 kg/L x SG/ 1000 <br /> Where: A = Area of the HMA mixture, sq yd (sq m). <br /> D = Depth of the HMA mixture, in. (mm). <br /> Gmb = Average bulk specific gravity of the mixture, from the approved mix design. <br /> V = Volume of the bituminous material, gal (L). <br /> SG = Specific Gravity of bituminous material as shown on the bill of lading. <br /> Basis of Payment. Bituminous materials cost adjustments may be positive or negative but will <br /> only be made when there is a difference between the BPIF and BPIF in excess of five percent, as <br /> calculated by: <br /> Percent Difference = {(BPIF— BPlp) - BPIF} X 100 <br /> Bituminous materials cost adjustments will be calculated for each calendar month in which <br /> applicable bituminous material is placed; and will be paid or deducted when all other contract <br /> requirements for the work placed during the month are satisfied. The adjustments shall not apply <br /> ' during contract time subject to liquidated damages for completion of the entire contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.