My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-28 Resolution Authorizing a Construction Engineering Services Agreement with WHKS and Co. and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge Over Sand Creek Arm of Lake Decatur
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-28 Resolution Authorizing a Construction Engineering Services Agreement with WHKS and Co. and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge Over Sand Creek Arm of Lake Decatur
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 3:52:46 PM
Creation date
2/8/2024 3:52:44 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-28
Res Ord Title
R2024-28 Resolution Authorizing a Construction Engineering Services Agreement with WHKS and Co. and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge Over Sand Creek Arm of Lake Decatur
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b)Establishing a drug free awareness program to inform employees about: <br /> (1)The dangers of drug abuse in the workplace; <br /> (2)The grantee's or contractor's policy to maintain a drug free workplace; <br /> (3)Any available drug counseling, rehabilitation and employee assistance program; and <br /> (4)The penalties that may be imposed upon an employee for drug violations. <br /> (c)Providing a copy of the statement required by subparagraph (a)to each employee engaged in the performance of the <br /> contract or grant and to post the statement in a prominent place in the workplace. <br /> (d)Notifying the contracting or granting agency within ten (10)days after receiving notice under part(b)paragraph(3)of <br /> subsection (a)above from an employee or otherwise receiving actual notice of such conviction. <br /> (e) Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation <br /> program. <br /> (f)Assisting employees in selecting a course of action in the event drug counseling,treatment and rehabilitation is <br /> required and indicating that a trained referral team is in place. <br /> Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act, <br /> the ENGINEER, LPA and the DEPARTMENT agree to meet the PROJECT SCHEDULE outlined in EXHIBIT B.Time is of the <br /> essence on this project and the ENGINEER's ability to meet the PROJECT SCHEDULE will be a factor in the LPA selecting the <br /> ENGINEER for future projects.The ENGINEER will submit progress reports with each invoice showing work that was completed <br /> during the last reporting period and work they expect to accomplish during the following period. <br /> 10. Due to the physical location of the project,certain work classifications may be subject to the Prevailing Wage Act(820 ILCS <br /> 130/0.01 et seq). <br /> 11. For Construction Engineering Contracts: <br /> (a)That all services are to be furnished as required by construction progress and as determined by the LPA employee In <br /> Responsible Charge.The ENGINEER shall complete all services herein within a time considered reasonable to the <br /> LPA,after the CONTRACTOR has completed the construction contract. <br /> (b)That all field notes,test records and reports shall be turned over to and become the property of the LPA and that <br /> during the performance of the engineering services herein provided for,the ENGINEER shall be responsible for any <br /> loss or damage to the documents herein enumerated while they are in the ENGINEER's possession and any such <br /> loss or damage shall be restored at the ENGINEER's expense. <br /> (c)That any difference between the ENGINEER and the LPA concerning the interpretation of the provisions of this <br /> AGREEMENT shall be referred to a committee of disinterested parties consisting of one member appointed by the <br /> ENGINEER, one member appointed by the LPA,and a third member appointed by the two other members for <br /> disposition and that the committee's decision shall be final. <br /> (d)That in the event that engineering and inspection services to be furnished and performed by the LPA(including <br /> personnel furnished by the ENGINEER)shall, in the opinion of the STATE be incompetent employed on such work <br /> at the expense of the LPA. <br /> (e)Inspection of all materials when inspection is not provided a the sources by the STATE Central Bureau of Materials, <br /> and submit inspection reports to the LPA and STATE in accordance with the STATE Central Bureau of Materials <br /> "Project Procedures Guide"and the policies of the STATE. <br /> AGREEMENT SUMMARY <br /> Prime Consultant(Firm)Name I TIN/FEIN/SS Number Agreement Amount <br /> WHKS and Co 42-0943938 $19,230.00 <br /> Subconsultants TIN/FEIN/SS Number Agreement Amount <br /> Subconsultant Total <br /> Prime Consultant Total $19,230.00 <br /> Total for all work $19,230.00 <br /> Completed 01/30/24 Page 5 of 9 BLR 05530(Rev.07108/22) <br />
The URL can be used to link to this page
Your browser does not support the video tag.