My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:20 AM
Creation date
2/8/2024 3:56:54 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-09
Res Ord Title
R2024-09 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Illinois Department <br /> of Transportation Check Sheet for Recurring Special Provisions <br /> Local Public Agency County Section Number <br /> City of Decatur Macon 19-00935-00-BR <br /> ❑ Check this box for lettings prior to 01/01/2023. <br /> The Following Recurring Special Provisions Indicated By An "X"Are Applicable To This Contract And Are Included By Reference: <br /> Recurring Special Provisions <br /> Check Sheet# Page No. <br /> 1 ❑ Additional State Requirements for Federal-Aid Construction Contracts 53 <br /> 2 ❑ Subletting of Contracts(Federal-Aid Contracts) 56 <br /> 3 ❑ EEO 57 <br /> 4 ❑ Specific EEO Responsibilities Non Federal-Aid Contracts 67 <br /> 5 ❑ Required Provisions-State Contracts 72 <br /> 6 ❑ Asbestos Bearing Pad Removal 78 <br /> 7 ❑ Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 79 <br /> 8 ❑ Temporary Stream Crossings and In-Stream Work Pads 80 <br /> 9 ❑ Construction Layout Stakes 81 <br /> 10 F-1Use of Geotextile Fabric for Railroad Crossing 84 <br /> 11 ❑ Subsealing of Concrete Pavements 86 <br /> 12 ❑ Hot-Mix Asphalt Surface Correction 90 <br /> 13 ❑ Pavement and Shoulder Resurfacing 92 <br /> 14 ❑ Patching with Hot-Mix Asphalt Overlay Removal 93 <br /> 15 ❑ Polymer Concrete 95 <br /> 16 ❑ Reserved 97 <br /> 17 ❑ Bicycle Racks 98 <br /> 18 ❑ Temporary Portable Bridge Traffic Signals 100 <br /> 19 ❑ Nighttime Inspection of Roadway Lighting 102 <br /> 20 ❑ English Substitution of Metric Bolts 103 <br /> 21 ❑ Calcium Chloride Accelerator for Portland Cement Concrete 104 <br /> 22 ❑ Quality Control of Concrete Mixtures at the Plant 105 <br /> 23 ❑ Quality Control/Quality Assurance of Concrete Mixtures 113 <br /> 24 ❑ Reserved 129 <br /> 25 ❑ Reserved 130 <br /> 26 ❑ Temporary Raised Pavement Markers 131 <br /> 27 ❑ Restoring Bridge Approach Pavements Using High-Density Foam 132 <br /> 28 ❑ Portland Cement Concrete Inlay or Overlay 135 <br /> 29 ❑ Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 139 <br /> 30 ❑ Longitudinal Joint and Crack Patching 142 <br /> 31 ❑ Concrete Mix Design- Department Provided 144 <br /> 32 ❑ Station Numbers in Pavements or Overlays 145 <br /> Printed 07/21/23 Page 1 of 2 BLR 11300(Rev. 10/25/22) <br />
The URL can be used to link to this page
Your browser does not support the video tag.