My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:20 AM
Creation date
2/8/2024 3:56:54 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-09
Res Ord Title
R2024-09 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'The following special provisions have been deleted from use. <br /> File Name Special Provision Title Effective Revised <br /> 50481 Building Removal-Case II (Non-Friable Asbestos) Sept. 1, 1990 April 1, 2010 <br /> 50491 Building Removal-Case III (Friable Asbestos) Sept. 1, 1990 April 1, 2010 <br /> ,The following special provisions are in the 2023 Supplemental Specifications and Recurring Special Provisions. <br /> File Name Special Provision Title New Location(s) Effective Revised <br /> 80293 Concrete Box Culverts with Skews > 30 Articles 540.04 & 540.06 April 1, 2012 July 1, 2016 <br /> Degrees and Design Fills <_ 5 Feet <br /> 80311 Concrete End Sections for Pipe Culverts Articles 540.07, 542.01, 542.02, Jan. 1, 2013 April 1, 2016 <br /> 542.07, 542.11 & 542.12 <br /> 80422 High Tension Cable Median Barrier Articles 644.02, 644.05, 782.01, Jan. 1, 2020 Jan. 1, 2022 <br /> ' 782.04, 782.07 & 1097.02 <br /> 80442 Hot-Mix Asphalt Articles 1030.09 & 1030.10 Jan. 1, 2022 Aug. 1, 2022 <br /> 80444 Hot-Mix Asphalt— Patching Errata—Article 442.08(b) April 1, 2022 <br /> ' 80411 Luminaires, LED Articles 801.05(x), 821.02(d), April 1, 2019 Jan. 1, 2022 <br /> 821.03, 821.08 & 1067.01-1067.06 <br /> 80418 Mechanically Stabilized Earth Retaining Articles 1003.07 & 1004.06 Nov. 1, 2019 Nov. 1, 2020 <br /> Walls <br /> 80430 Portland Cement Concrete— Haul Time Article 1020.11(a)(7) July 1, 2020 <br /> 80395 Sloped Metal End Section for Pipe Culverts Articles 540.07, 542.01, 542.02, Jan. 1, 2018 <br /> 542.07, 542.11 & 542.12 <br /> ' 80318 Traversable Pipe Grate for Concrete End Articles 540.04, 540.07, 540.08 & Jan. 1, 2013 Jan. 1, 2018 <br /> Sections 542.01, 542.02, 542.07, 542.11 & <br /> 542.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.