My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:20 AM
Creation date
2/8/2024 3:56:54 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-09
Res Ord Title
R2024-09 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's yard or another job and the cost to re-mobilize, whichever is less. <br /> Rental equipment may be paid for longer than two weeks provided the Contractor <br /> presents adequate support to the Department (including lease agreement) to show <br /> retaining equipment on the job is the most economical course to follow and in the <br /> public interest. ' <br /> (3) Reduced Rate of Production Delay. The Contractor will be compensated for the <br /> reduced productivity for labor and equipment time in excess of the 25 percent <br /> threshold for that portion of the delay in excess of seven calendar days. <br /> Determination of compensation will be in accordance with Article 104.02, except <br /> labor and material additives will not be permitted. , <br /> Payment for escalated material costs, escalated labor costs, extended project overhead, <br /> and extended traffic control will be determined according to Article 109.13." <br /> Revise Article 108.04(b) of the Standard Specifications to read: <br /> "(b) No working day will be charged under the following conditions. <br /> (1) When adverse weather prevents work on the controlling item. <br /> (2) When job conditions due to recent weather prevent work on the controlling item. <br /> (3) When conduct or lack of conduct by the Department or its consultants, <br /> representatives, officers, agents, or employees; delay by the Department in making <br /> the site available; or delay in furnishing any items required to be furnished to the <br /> Contractor by the Department prevents work on the controlling item. ' <br /> (4) When delays caused by utility or railroad adjustments prevent work on the controlling <br /> item. <br /> (5) When strikes, lock-outs, extraordinary delays in transportation, or inability to procure <br /> critical materials prevent work on the controlling item, as long as these delays are not <br /> due to any fault of the Contractor. t <br /> (6) When any condition over which the Contractor has no control prevents work on the <br /> controlling item." <br /> Revise Article 109.09(f) of the Standard Specifications to read.. <br /> "(f) Basis of Payment. After resolution of a claim in favor of the Contractor, any adjustment <br /> in time required for the work will be made according to Section 108. Any adjustment in <br /> the costs to be paid will be made for direct labor, direct materials, direct equipment, ' <br /> direct jobsite overhead, direct offsite overhead, and other direct costs allowed by the <br /> resolution. Adjustments in costs will not be made for interest charges, loss of anticipated <br /> profit, undocumented loss of efficiency, home office overhead and unabsorbed overhead <br />
The URL can be used to link to this page
Your browser does not support the video tag.