My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-39 Resolution Authorizing a Letter of Amendment to the Construction and Maintenance Agreement with the Illinois Central Railroad Company for the Brush College Road Grade Separation Project, City Project 2009-33, Section No. 09-00933-01-BR
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-39 Resolution Authorizing a Letter of Amendment to the Construction and Maintenance Agreement with the Illinois Central Railroad Company for the Brush College Road Grade Separation Project, City Project 2009-33, Section No. 09-00933-01-BR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 4:23:46 PM
Creation date
2/8/2024 4:23:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-39
Res Ord Title
R2024-39 Resolution Authorizing a Letter of Amendment to the Construction and Maintenance Agreement with the Illinois Central Railroad Company for the Brush College Road Grade Separation Project, City Project 2009-33, Section No. 09-00933-01-BR
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSSING IDENTIFICATION: <br /> RAILROAD: Illinois Central Railroad Company <br /> RR MILEPOST: 0.83 AAR/DOT NO. 291384M (E Harrison Ave) <br /> ROAD NAME: Brush College Road <br /> LOCATION: Decatur, Illinois <br /> EXISTING CONDITIONS: <br /> Four(4) lane roadway with center turn lane (70')with concrete surface materials protected by <br /> crossbuck signs. <br /> DESCRIPTION OF WORK TO BE PERFORMED BY RAILROAD: <br /> Flagging and any other protective services. <br /> Install automatic lights and gates with CWT circuitry at Faries Parkway DOT/FRA# 291386B. <br /> Remove the existing East Harrison Avenue DOT/FRA#291834M crossing surface materials and install <br /> new crossing panel, surface material, automatic lights and gates with CWT circuitry at the new <br /> location. <br /> Review of project plans as required per agreement. <br /> DESCRIPTION OF WORK TO BE PERFORMED BY LOCAL AGENCY: <br /> All other work not performed by ICRR and required by Project Plans. <br /> LOCAL AGENCY's SHARE OF RAILROAD COST: <br /> 100% <br /> NOTIFY BEFORE COMMENCING WORK: <br /> Illinois Central Railroad Company City of Decatur <br /> c/o Nick Burwell c/o , Matt Newell <br /> Manager of Public Works Public Works Director <br /> 17641 Ashland Ave 1 Gary K. Anderson Plaza <br /> Homewood, Illinois 60430 Decatur, Illinois, 62523 <br /> ph. (319)427-1031 ph. (217)424-2747 <br /> nicholas burwell(dcn ca mnewel l(aD-decaturil.gov <br /> � 12 ^' <br />
The URL can be used to link to this page
Your browser does not support the video tag.