Laserfiche WebLink
Central TIF Redevelopment Plan and Project Area Decatur, Illinois <br /> eligibility criteria. Affordable housing may be either in existing or newly constructed <br /> buildings. For purposes of this requirement in the TIF Act, `low-income households," <br /> "very low-income households,"and"affordable housing"have the definitions set forth in <br /> the Illinois Affordable Housing Act. <br /> Description of Redevelopment Project Costs <br /> Costs that may be reimbursed are defined as "redevelopment project costs"in the Act and <br /> may be amended from time to time.Itemized below is the statutory listing of`�redevelop- <br /> ment project costs"currently permitted by the Act: <br /> 1. Costs of studies, surveys, development of plans, and specifications,implementation <br /> and administration of the redevelopment plan including but not limited to staff and <br /> professional service costs for architectural, engineering, legal, financial, planning or <br /> other services, provided however that no charges for professional services may be <br /> based on a percentage of the tax increment collected; except that on and after No- <br /> vember 1,1999(the effective date of Public Act 91-478),no contracts for professional <br /> services, excluding architectural and engineering services,may be entered into if the <br /> terms of the contract extend beyond a period of 3 years. <br /> In addition,"redevelopment project costs"shall not include lobbying expenses. After <br /> consultation with the municipality,each tax increment consultant or advisor to a mu- <br /> nicipality that plans to designate or has designated a redevelopment project area shall <br /> inform the municipality in writing of any contracts that the consultant or advisor has <br /> entered into with entities or individuals that have received, or are receiving, pay- <br /> ments financed by tax increment revenues produced by the redevelopment project <br /> area with respect to which the consultant or advisor has performed, or will be per- <br /> forming, service for the municipality. This requirement shall be satisfied by the con- <br /> sultant or advisor before the commencement of services for the municipality and <br /> thereafter whenever any other contracts with those individuals or entities are exe- <br /> cuted by the consultant or advisor; <br /> (i) After J my 1, 1999,annual administrative costs shall not include general overhead <br /> or administrative costs of the municipality that would still have been incurred by the <br /> municipality if the municipality had not designated a redevelopment project area or <br /> approved a redevelopment plan; <br /> (ii) The cost of marketing sites within the redevelopment project area to prospective <br /> businesses, developers,and investors; <br /> 2. Property assembly costs, including but not limited to acquisition of land and other <br /> property, real or personal, or rights or interests therein, demolition of buildings, site <br /> preparation, site improvements that serve as an engineered barrier addressing <br /> ground level or below ground environmental contamination, including, but not <br /> 23 <br />