My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-67 Resolution Authorizing Stipulated Agreement 2309 Concerning Safety Improvements at the At-Grade Crossing with the Illinois Central Railroad Company at Martin Luther King Jr. Drive and Wood Street
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-67 Resolution Authorizing Stipulated Agreement 2309 Concerning Safety Improvements at the At-Grade Crossing with the Illinois Central Railroad Company at Martin Luther King Jr. Drive and Wood Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2024 12:36:18 PM
Creation date
3/6/2024 12:35:11 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-67
Res Ord Title
R2024-67 Resolution Authorizing Stipulated Agreement 2309 Concerning Safety Improvements at the At-Grade Crossing with the Illinois Central Railroad Company at Martin Luther King Jr. Drive and Wood Street
Department
Public Works
Approved Date
3/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA 2309 Exhibit A <br /> Page 2 <br /> VISIBILITY STUDY: See Location Sketch (Page 3) <br /> Train Speed 35 MPH <br /> Roadway Speed 30 MPH <br /> Required Stopping Sight Distance (SSD) <br /> Along Roadway 222 FEET <br /> Along Tracks 346 FEET <br /> Reqd. Clearing Sight Dist. (CSD) (Along Tracks) 600 FEET <br /> Distances calculated per American Association of State Highway and Transportation Officials(AASHTO),A Policy on <br /> Geometric Design of Highways and Streets,2001, Fourth Edition. <br /> QUADRANT CSD OBSTRUCTION SSD OBSTRUCTION <br /> FT FT <br /> NE OBST BUILDINGS/ANGLE OBST BUILDINGS <br /> NW OBST I BUILDINGS/ANGLE OBST BUILDINGS <br /> SE OBST BUILDINGS/ANGLE OBST BUILDINGS <br /> SW OBST BUILDINGS/ANGLE OBST BUILDINGS <br /> 'Note: Automatic flashing light signals and gates(AFLS&G)eliminate the need to satisfy minimum Sight Distance criteria. <br /> APPROACH GRADES: See Location Sketch (Page 3) <br /> DIRECTION/South DIRECTION/North <br /> DISTANCE ELEVATION GRADE DISTANCE ELEVATION GRADE <br /> FT FT % FT FT <br /> SEE EXHIBIT A PAGE 3 <br /> Distance measured from outermost rail. <br /> COMMENTS: <br /> See Page 3 for a Location Sketch (Aerial Photo) of the crossing. <br /> Staff recommends that the GCPF be used pay 95% of the cost to install new automatic <br /> flashing lights signals, event recorder, remote monitor, and track circuits, and that the IC pay <br /> all remaining installation costs for the new automatic warning devices. Staff also <br /> recommends that IC be responsible for all future operation and maintenance costs <br /> associated with the new automatic warning devices and crossing control circuitry at the Martin <br /> Luther King Jr. Drive crossing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.