Laserfiche WebLink
SA23O9 EXHIBIT B <br /> Martin Luther King, Jr. Drive &Wood St Page 4 <br /> Decatur, IL 22-1609 <br /> FHWA ADDITIVES <br /> Material $ 179,040.00 <br /> Material Additive 5.00% $ 8,952.00 <br /> Signal Labor $ 56,000.00 <br /> Signal Labor Additive 159.61% $ 89,382.00 <br /> Engineering Labor $ 5,000.00 <br /> Engineering Labor Additive 159.61% $ 7,981.00 <br /> Accounting Labor $ 200.00 <br /> Accounting Labor Additive 159.61% $ 319.00 <br /> Other $ 162,223.00 <br /> Total - Direct Costs $402,463.00 <br /> Total -Additives $ 106,634.00 <br /> Grand Total FHWA Basis $ 509,097.00 <br /> Funding Source(DOT) 100.00% of FHWA Amount $ 509,097.00 <br />