SA 2309 <br /> (b) Installation of a railroad interconnect cable from the railroad crossing controller <br /> unit inside the new railroad crossing signal bungalow to a junction box <br /> mounted on the outside of the new railroad crossing signal bungalow, by the <br /> Company. <br /> [Note: The junction box shall be securely locked with a padlock provided by the <br /> Company.] <br /> (c) Installation of a railroad interconnect cable from the junction box mounted on <br /> the outside of the new railroad crossing signal bungalow to the new traffic <br /> signal controller and traffic signal control cabinet, by the City. <br /> [Note: The railroad interconnect cable shall be an appropriate three-wire communication <br /> cable, with specifications to be provided in advance to the Illinois Commerce <br /> Commission's Railroad Safety Section.] <br /> (d) Install new traffic signal controller and traffic signal control cabinet, to include <br /> battery backup and remote monitoring capabilities, by the City. <br /> (e) Renew railroad advance warning pavement markings ("RXR"), stop bars, and <br /> W10-1 advance warning signs on the highway approaches, in accordance with <br /> the minimum requirements of 92 III. Adm. Code 1535.310 (Exhibit Cl) and the <br /> most current revision of the Manual on Uniform Traffic Control Devices(MUTCD), <br /> by the City. <br /> (f) Replace all four (4) existing antiquated turn restriction blank out signs with new <br /> R3-1 a LED turn restriction blank out signs to include the word "TRAIN" beneath <br /> the international "No Turn" symbol, all per the MUTCD, by the City. <br /> (g) Install "Caution Walk Time Shortened When Train Approaches" signs near <br /> each pedestrian signal display, such that a pedestrian from within the <br /> crosswalk can see the sign, by the City. <br /> Section 3 The Company has prepared a preliminary "detailed" cost estimate and circuit <br /> plans to accomplish the proposed safety improvements, which may be required by <br /> Commission Order. The cost estimate and circuit plans are attached and incorporated <br /> herein by reference as Exhibit B. <br /> The City has provided a preliminary "detailed" cost estimate cost estimate (Exhibit 131)for <br /> upgrading antiquated Traffic Signal Equipment and the installation of new railroad <br /> interconnect cable from the junction box mounted on the outside of the new railroad <br /> crossing signal bungalow to the new traffic signal controller unit and control cabinet. The <br /> City shall, upon issuance of a Commission Order, according to the requirements <br /> contained therein, prepare and submit any required drawings and specifications for the <br /> interconnect cable run for the approval of the Commission and IDOT. The City agrees <br /> that an appropriate time for the submission should be ninety (90) days from the date of a <br /> Commission Order approving this Agreement. <br /> Section 4 The Company and the City shall, each upon Order, according to the <br /> requirements contained therein, proceed toward the completion of the proposed signal <br /> improvements, accomplishing the work with its own forces or appropriate contracted <br /> 2 <br />