Laserfiche WebLink
SA2307 Exhibit B <br /> Martin Luther King Jr Dr Page 4 <br /> Decatur, IL 22-1608 <br /> FHWA ADDITIVES <br /> Material $204,780.00 <br /> Material Additive 5.00% $ 10,239.00 <br /> Signal Labor $ 52,500.00 <br /> Signal Labor Additive 159.61% $ 83,795.00 <br /> Engineering Labor $ 5,000.00 <br /> Engineering Labor Additive 159.61% $ 7,981.00 <br /> Accounting Labor $ 200.00 <br /> Accounting Labor Additive 159.61% $ 319.00 <br /> Other $109,810.00 <br /> --------- --------- <br /> --------- --------- <br /> TOTAL DIRECT COSTS $372,290.00 <br /> TOTAL FHWA ADDITIVES $ 102,334.00 <br /> GRAND TOTAL FHWA BASIS $ 474,624.00 <br />