City of Decatur <br /> ii U:ard <br /> _--ATT—AUNT 1_RECUMMENDED ACTION <br /> Descriation o(ACIy( General Location of ACM <br /> Designation <br /> Asbestos-Contaminated Demolition Debris Original Structure <br /> Asbestos-Contaminated Demolition Debris North Classroom Addition Presumed <br /> Presumed <br /> Asbestos-Contaminated Demolition Debris West Classroom AdditionPresumed <br /> A3taes*c-s Contaminated Demolition Debris in Main SteucEurr(Presumed)-The Main Structure consists of <br /> the Original Building,a North Classroom Addition,and a West Classroom Addition.The Powerhouse Building <br /> is a standalone,non-contiguous structure,that was inspected and a determination was made that no suspect <br /> asbestos-containing material was present.With respect to the Main Structure,the City of Decatur has condemned <br /> the building and it will be demolished;it is unsafe because of failed roofing systems,exposures to animal wastes <br /> including rodent and bird droppings,and fall hazards exists throughout the building due to wet floors,torn floor <br /> coverings,holes in floors,and missing hand and guard rails. The Structural Engineer's Report in Attachment 5 <br /> presupposes a heightened risk to human health and safety upon entry into the building.As the Main Structure <br /> could not be inspected,all demolition debris is presumed to be asbestos-contaminated waste and demolition <br /> must proceed per the recommendations below. <br /> Recommended Action for Demolition <br /> 1. Submit the TEPA 14-Calendar Day Notification of Demolition_ <br /> 2.Attach the City of Decatur Condemnation Letter and the Structural Engineer's Report to Notification. <br /> 3.Keep a copy of the Asbestos NESHAP Report on site during demolition. <br /> 4.Prepare a Site Safety Plan and a Plan on how to control water runoff and airborne emissions at the site. <br /> 5.The above Plan shall be prepared by the Demolition Contractor. <br /> 6.An Asbestos Abatement Contractor(AAC)Supervisor shall be present during demolition. <br /> 7.The AAC shall determine if a taborer and remediation equipment is needed on site for Response Action Work. <br /> 8.An Air Sampling Professional shall perform monitoring to check effectiveness of plan submitted in 4 above. <br /> 9.Perform all demolition work under wet methods and keep all debris covered while in transit to landfill. <br /> 10.Retain trip tickets,landfill disposal receipts,and manifests showing proper disposal of presume ACM debris. <br /> 11.Ensure exposure monitoring is performed on Equipment Operators and the Demolition Contractor's forces. <br /> 12.The exposure monitoring in 1 I above may be suspended if a Negative Exposure Assessment is cited. <br /> 13.At completion of site work take a representative number of clearance soil samples to document site closure. <br /> 14.A final report documenting site activities and monitoring shall be prepared and be submitted to the City. <br /> 15. Include manifests and regulatory submittals in 14 above so it can be used in case of a FOIA Request. <br /> Attachment t I Page ATT I-i I Former Durfee School Building NESHAP Report e-,2024 CourticeGrason LLC.All Rights Reserved. <br />