BliflENGINEERS, LLC Report of Field Inspection <br /> CONSULTING 2800 N.MARTIN LUTHER KING JR DRIVE•DECATUR,ILLINOIS 62526 217-877-2100•FAX 217.877-4816 <br /> ENGINEERS www.sksengineem.com <br /> PROJECT: Building Inspection PROJECT NO. 418663 <br /> 1222 East Grand, DATE OF INSPECTION: January 17, 2024 <br /> Decatur, Macon County, <br /> Illinois 62521 <br /> CLIENT: City of Decatur REPORT NO. 418663.01 <br /> #1 Gary K Anderson Plaza, <br /> Decatur, Illinois 62523 <br /> CC: Jon Kindseth PAGE NO. 1 of 2 <br /> ITEMS INSPECTED: <br /> SKS was asked to perform an inspection of a building at 1222 East Grand, Decatur, Illinois. The <br /> building is identified in the attached aerial photograph. <br /> BACKGROUND INFORMATION: <br /> The building is three stories tall and comprised of masonry walls with floor and stair systems with <br /> various types of structural members. Photographs and inspection summaries conducted by the City <br /> of Decatur were provided. A copy of some of the photographs are attached for reference. It had <br /> been determined the building requires asbestos remediation and a contractor was asked to conduct <br /> a walkthrough. After the walkthrough, the contractor was concerned the building may be structurally <br /> unsafe in some areas. The purpose of this inspection is to assess the structural condition of the <br /> building. <br /> OBSERVATIONS: <br /> The building was examined thoroughly from the exterior at ground level and on the interior in a limited <br /> capacity. Access to the building's interior was limited because of the condition of the building and a <br /> lack of means to enter the building. <br /> Degradation of the masonry walls was observed consistently around the exterior. Complete mortar <br /> degradation, cracking, and a collapsed wall near the boiler room were specifically observed. Major <br /> soil loss and undermining of the asphalt surface on the north side of the building has led to failure of <br /> the asphalt surface. <br /> Structural damage on the interior was also observed in several areas and seemed to line up with the <br /> observations described by the City and contractor during their walkthroughs. Significant damage and <br />