My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-104 Resolution Chemical Feed Upgrades and Bulk Water Upgrades
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-104 Resolution Chemical Feed Upgrades and Bulk Water Upgrades
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:55:34 AM
Creation date
4/19/2024 9:55:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-104
Res Ord Title
R2024-104 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy, and Tilly to Provide Engineering Services for the Chemical Feed Upgrades and Bulk Water Upgrades
Department
Public Works
Approved Date
4/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Contract Document Preparation Complete preparation of the construction contract documents by <br /> filling in the necessary information in Parts I, II, and IV of the City's standard CICO. The <br /> Consulting Engineer shall prepare Part 3 "Technical Specification"of the CICC for inclusion in <br /> the standard construction contract. The Consulting Engineer shall not alter the City's standard <br /> contract document without the permission of the City's Representative. The City's <br /> Representative may provide the Consulting Engineer with previously prepared Technical <br /> Specifications which may be used as appropriate. The Consulting Engineer shall, to the <br /> maximum extent possible, follow the formats for Technical Specifications as provided by the <br /> City's Representative. <br /> 5, Document Presentation. Furnish paper copies and digital copies of the CICC in the number and <br /> format specified in Exhibit A, Scope of Work and present and review the CICC in person with the <br /> City as the City's Representative shall direct. The cost of document reproduction shall be <br /> considered to be a reimbursable expense and paid in accordance with Section V(C) of this <br /> Agreement. <br /> 6. Completion Time. The Final Drawings and Specifications shall be completed, submitted and <br /> approved by the City's Representative within the time period set forth in Exhibit C, Project <br /> Timeline. <br /> D. BIDDING PHASE. <br /> The Consulting Engineer shall, after written authorization to proceed with the Bidding Phase: <br /> 1. Assist in Bidding. Assist the City's Representative in obtaining bids for each separate City <br /> contract for construction, materials, equipment and services for the Project. <br /> 2. Advise Regarding Contractors and Subcontractors Consult with and advise the City's <br /> Representative as to the acceptability of subcontractors and other persons and organizations <br /> proposed by the City's Contractors, ("Contractors"), for those portions of the work as to which <br /> such acceptability is required by the bidding documents. <br /> 3. Consult Regarding Substitutes. Consult with and advise the City's Representative as to the <br /> acceptability of substitute materials and equipment proposed by the Contractors when substitution <br /> prior to the award of contracts is allowed by the bidding documents. <br /> 4. Distribute Plans and Contract Documents to Bidders Reproduce sufficient copies of the plans <br /> and contract documents and make them available to all prospective bidders. The Consulting <br /> Engineer shall create a Plan Holder List by recording the business name,contact person name, <br /> address, telephone number, fax number and email address of each of the bidders taking a set of <br /> plans and contract documents. The Consulting Engineer shall collect from each of the bidders a <br /> payment for the plans equal to the amount of the cost of duplication. The payment from the <br /> bidder shall be made to the Consulting Engineer, which shall offset the cost of duplication; said <br /> amounts shall not be billed to the City. Alternately, the Consulting Engineer may arrange to have <br /> plans and specifications rnade available to prospective bidders through the services of a plan and <br /> specification duplication firm that offers plan distribution services provided that the firm obtains <br /> the same bidder infonnation as required of the Consulting Engineer and that no cost for this <br /> service be billed to the City. <br /> 5. Respond to Questions from Bidders Receive and respond to questions from prospective bidders <br /> during the bidding period. All responses shall be written and shall be provided to all plan holders <br /> as listed on the Plan Holder List. Questions received five (5)business days before the bid <br /> opening shall be answered. Questions received between four(4) and two(2)business days before <br /> the bid opening may be answered provided that a means exists to communicate the answer in <br /> 4 <br /> Last Revised: 2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.