Laserfiche WebLink
Central TIF Redevelopment Plan and Project Area Decatur, Illinois <br /> G. Lack of ventilation light,or sanitary facilities.The absence of adequate venti- <br /> lation for light or air circulation in spaces or rooms without windows, or that <br /> require the removal of dust, odor, gas, smoke, or other noxious airborne ma- <br /> terials. Inadequate natural light and ventilation means the absence of sky- <br /> lights or windows for interior spaces or rooms and improper window sizes and <br /> amounts by room area to window area ratios. Inadequate sanitary facilities <br /> refers to the absence or inadequacy of garbage storage and enclosure, bath- <br /> room facilities,hot water and kitchens, and structural inadequacies prevent- <br /> ing ingress and egress to and from all rooms and units within a building. <br /> H. Inadequate utilities.Underground and overhead utilities such as storm sewers <br /> and storm drainage,sanitary sewers,water lines,and gas,telephone,and elec- <br /> trical services that are shown to be inadequate. Inadequate utilities are those <br /> that are:(i)of insufficient capacity to serve the uses in the redevelopment pro- <br /> ject area, (ii) deteriorated,antiquated,obsolete,or in disrepair, or(iii) lacking <br /> within the redevelopment project area. <br /> I. Excessive land coverage and overcrowding of structures and community facil- <br /> ities. The over-intensive use of property and the crowding of buildings and <br /> accessory facilities onto a site.Examples of problem conditions warrantingthe <br /> designation of an area as one exhibiting excessive land coverage are: (i) the <br /> presence of buildings either improperly situated on parcels or located on par- <br /> cels of inadequate size and shape in relation to present-day standards of de- <br /> velopment for health and safety,and(ii)the presence of multiple buildings on <br /> a single parcel.For there to be a finding of excessive land coverage,these par- <br /> cels must exhibit one or more of the following conditions:insufficient provi- <br /> sion for light and air within or around buildings,increased threat of spread of <br /> fire due to the close proximity of buildings,lack of adequate or proper access <br /> to a public right-of-way,lack of reasonably required off-street parking, or in- <br /> adequate provision for loading and service. <br /> J. Deleterious land use or layout. The existence of incompatible land-use rela- <br /> tionships,buildings occupied by inappropriate mixed-uses,or uses considered <br /> to be noxious,offensive,or unsuitable for the surrounding area. <br /> K. Environmental clean-W. The proposed redevelopment project area has in- <br /> curred Illinois Environmental Protection Agency or United States Environ- <br /> mental Protection Agency remediation costs for, or a study conducted by an <br /> independent consultant recognized as having expertise in environmental re- <br /> mediation has determined a need for, the clean-up of hazardous waste, haz- <br /> ardous substances, or underground storage tanks required by State or federal <br /> law,provided that the remediation costs constitute a material impediment to <br /> the development or redevelopment of the redevelopment project area. <br /> L. Lack of community planning. The proposed redevelopment project area was <br /> developed prior to or without the benefit or guidance of a community plan. <br /> 9 <br />