My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:20:32 PM
Creation date
5/21/2024 2:20:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-225
Res Ord Title
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Department
Public Works
Approved Date
5/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C11 <br /> CONCENTRIC <br /> I N T E G R A T I O N <br /> 10. Users will be assigned a security level, limiting them to certain SCADA functionality and/or specific <br /> graphics. <br /> 11. Setup and configure the SCADA historian to log historical data with the criteria set forth in sections above. <br /> a. Historize datapoints within Ignition to provide the same historical data logging configured in the iFix <br /> Historian. <br /> b. Install and configure Microsoft SQL 2022 on the SCADA Historians.The Ignition SCADA software will <br /> automatically generate the appropriate databases within SQL to store historical data. <br /> c. Install and configure Microsoft SQL database connector within Ignition. <br /> 12. Provide up to forty(40) hours of SCADA training. <br /> Documentation <br /> 1. Provide via USB flash drive or secure electronic file-share using Microsoft OneDrive, or similar, electronic <br /> copies of the following: <br /> a. Updated Network Diagram <br /> b. Signed Field Device Test Reports <br /> c. Migrated PLC Programs <br /> d. As-built wiring diagrams, detailing the completed installations. <br /> e. Ignition SCADA backup. <br /> Fee <br /> Our fee for the above scope is a lump sum of$851,950. <br /> This proposal is valid for 90 days from the date issued. <br /> Concentric Assumptions / Customer Responsibilities <br /> 1. Customer will assign an initial project manager at the project kickoff meeting. <br /> 2. Customer will provide site access for installation and startup during Customer's normal business hours. <br /> Work outside of Customer's normal business hours can be agreed upon as needed, provided Concentric <br /> can secure the site(s) upon departure. <br /> 3. Customer understands that all existing equipment to remain is assumed to be in good, working order. In <br /> the event that any other equipment does not perform as-expected, Concentric will work with the <br /> Customer to repair, as-needed, under a separate contract. <br /> 4. Customer will dispose of/recycle any removed equipment. <br /> Project#0230159.00 Page No.9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.